Permit Review Detail
Review Status: Completed
Review Details: REVISION
Permit Number - T03CM03375
Review Name: REVISION
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/28/2004 | Robert Sherry | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
05/28/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise floor drains FD-3 and FD-4, floor sink FS-4, and their trap arms as required to comply with Section 1003.3 and Table 10-1, UPC 1994 with AZ State amendments. Note: floor drains FD-2 and FD-4 along with floor sink FS-3 are scheduled with 3" waste connections on Sheet P-2. The trap and the trap arm must be the same size. 2. Correct the notation on sheet K-2 for the hand wash sinks, K58, and the utility sinks, K133, to delete the requirement for an indirect waste connection; a direct connection is required. Revise the drainage piping as required. Reference Section 304.0, UPC 1994. 3. The submitted information for the dishwasher, K-34, the potwasher, K-166, and the glasswasher B09 does not indicate a cross-connection device (a pressure vacuum breaker or a reduced pressure backflow preventer) has been installed in the equipment. Please provide the required cross-connection device. Reference Section 603, UPC 1994. 4. Revise the gas piping calculations and drawing to coordinate with the gas input as shown on the equipment submittals. Note: the natural gas supplied in Tucson by Southwest Gas is approximately 1000 BTU/Cubic foot. Reference Sections 1216.2 and 1216.3, UPC 1994. 5. Provide information to show how the cold water is used for hood K75C and why it requires only an atmospheric vacuum breaker while the hot water to the other hoods is protected with a reduced pressure backflow preventer. |
06/09/2004 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Approv-Cond | Architect to date plans prior to issuance |
06/11/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. Sheet E-2 1. The following circuits on Panel D differ from those of approved plans, and as such shall be included in revision clouds: 1,3,5,7,9,25,29,33,39. 2. The following circuits on Panel A differ from those of approved plans, and as such shall be included in revision clouds: 7,9,11,18,26,28. Please include revised panel load calculations in revision cloud as well. 3. The following circuits on Panel C differ from those of approved plans, and as such shall be included in revision clouds: 35,37; these circuits carried 1200 VA each on approved drawings, and are now listed as spares. Please include revised panel load calculations in revision cloud as well. 4. The following circuits on Panel F differ from those of approved plans, and as such shall be included in revision clouds: 18,20. Please include revised panel load calculations in revision cloud as well. 5. Please document revision to Circuit CR-24. 6. Since the loads for Panels A-F have been corrected from the permitted submittal, please enclose these figures in your revision clouds. Sheet E-4 1. Keynote 22, please change the wording "NEC Article 422-21 (b)" to read "NEC Article 422-31 (b)". 2. Area including Equipment 68, K165, and K166, near Grid 21-F, differs in configuration from that of approved plans, and as such shall be included in revision clouds. 3. There is a Keynote 46 by Grid 19-J on the plans. No such Keynote. 4. Tea-Maker Dispenser, at 15A per Sheet K-2, should have 1800 VA, not 1200. Please Correct Circuit D-3. 5. Panini Grill, on Circuit D-34, has 676 VA on Panel Schedule, and 32.4 KWH on Sheet K-2. Do the kitchen specifications mean "KW"? Please clarify. 6. There is an area by Grid 9-M missing Circuits B-28,30,32 from approved plans, and as such shall be included in revision clouds. 7. Convenience receptacles by Grid 10-G do not appear on approved plans, and as such shall be included in revision clouds. 8. Circuit E-31, since it powers Equipment 74,83, and 84 per the Panel Schedule, should have 996 VA, not 450. 9. Circuit B-8 has Equipment B26 on plans, but not on Panel Schedule. 10. Please make the corrections above, and recheck kitchen branch circuits for accuracy. Sheet E-6 1. Equipment in area by Grid 10-H differs from that in approved plans, and as such shall be included in revision clouds. Sheet E-7 1. Phase Current Amps, Total VA, Three Phase Amps, Total LCL VA, and Total LCL Amps on Panel DMB differ from those on the approved drawings, and as such shall be included in revision clouds. Otherwise OK. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/16/2004 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
06/16/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |