Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T03CM03192
Parcel: 140420460

Address:
6608 S TUCSON BL

Review Status: Completed

Review Details: 3RD PARTY REVIEW-COMMERCIAL TI

Permit Number - T03CM03192
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/15/2003 WILDAN 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied GENERAL COMMENTS:

1. This project has been reviewed for conformance with the 2000 IBC, 1997 UAC, 2000 IMC, 1998 IECC, 1999 NEC codes with local modifications, and the 1994 UPC with State of Arizona Amendments. Any revisions to this plan will require an additional review and approval by Willdan.

2. On Sheet G1.1 the 101 Life Safety code has not been adopted by the City of Tucson.

3. Please indicate occupancy group as A-2 for this project.


ARCHITECTUAL COMMENTS:

Sheets A2.1, A2.2, A2.3, and A2.4

1. Door #114 from the Corridor #113 to the Kitchen is shown on the Schedule to be a Type 'B', which shows a vision panel in the door; however, the Schedule does not show the glass symbol. Please coordinate and clarify.

2. The Beer Cooler door shows a door labeled 112 on the Floor Plan; yet, the Door Schedule is blank for Door 112. This door is shown opening into the required exit corridor/passageway. IBC Section 1005.3.3.1, Exception, states, "Doors, when fully opened, and handrails, shall not reduce the required width by more than 7 inches. Doors in any position shall not reduce the required width by more than one-half . . .." Since this "corridor" is a required exit passageway, this provision shall apply. Please provide clear notes and details to ensure that the Beer Cooler Door complies.

3. The Equipment Schedule on Sheet A2.4 shows #136 as "Not Used"; however, the symbol is shown in the Manager's Office. Please coordinate and resolve.

4. The wall finish in the men's and women's Toilet Rooms shows "PST-3/CT-___." One shows a base of PST-3, and the other a base of PST-4. Please clarify.

Sheets A4.1 and A5.2

1. Please coordinate and resolve. Correctly key and detail Roof Drain Scupper.

Sheet A5.1

1. The roof drain gutter and downspouts are missing from the South Elevation. Please coordinate with Sheet A4.1 and resolve.

Sheet A6.1

1. At Toilet Room elevations 14 and 15, the Keynote #10 is incorrectly referenced to the sink countertop. Please coordinate and correct.

Sheets A6.2

1. The Accessories, Finish Legend, and Keynotes are inappropriate for the Kitchen elevations, and there is no reference to Sheet A2.4 for the Equipment Schedule. Please coordinate and resolve.


STRUCTURAL COMMENTS:

Sheet S0.1

1. Special Inspection shall be required for the field welding of the light steel framing for the V.I.P. Room floor framing as shown on the Section 13/S2.1, and for field welding of lintel beam to bearing plate, in accordance with IBC Section 1704.3.1.

Sheets S1.1 and S2.1

1. Provide structural calculations for the floor framing for the V.I.P. Room light steel framing. Calculations were provided for the platform, but not for the V.I.P. Room floor framing.


PLUMBING COMMENTS:

Sheets A1.2 and A1.4

1. Keynote #8 references Detail 15/A1.4; however, the space for Detail 15, "Irrigation Backflow Preventor" is blank. Please coordinate and resolve the discrepancy.

Sheet M3.1

1. Provide a gas riser diagram showing length of each branch, and gas demand for each, with pipe sizes.

2. The size of the gas is omitted at the note to run the CW, HW, HWR&G overhead. Please remove the dashes and show the size.

3. Please coordinate the gas demand for the water heater shown as 199 CFH on this sheet and 98 CFH on the Plumbing Fixture Specifications.

4. The size of the waste and vent piping for the water closets in the Women's Toilet Room is missing. Please coordinate and correct.

5. The size of the vent and VTR at the Grease Interceptor is missing. Please correct.

Sheet M3.2

1. The Fixture Schedule shows 2-(P-8) 3-compartment sinks at 4 F.U. each for a total of only 4 F.U. Please recheck and correct.

2. The Waste and Vent Diagrams only account for 26 of the 31 fixtures shown on Sheet M3.1. Please coordinate and clarify.


MECHANICAL COMMENTS:

Sheet M1.3

1. Add Mechanical Specification or note that all duct seams and joints shall be sealed in accordance with 2000 IMC Section 603.8 and 1998 IECC Section 703.8.

2. Provide outside air as required by IMC Table 403.3. Even using the total shown on the balancing table for just the bar area, the amount shown of 4,600 CFM is much less than required by the IMC: 3695 (100) x 30 = 11,085 CFM required.
1000
Please revise to comply with the IMC Table 403.3.

ELECTRICAL COMMENTS:

Sheet E0.2

1. Note that all exterior light fixtures shall comply with the Tucson Outdoor Lighting Code and shall be full cut-off shielded with no dropped lenses.

2. Clarify by note or specification that all fixtures on the exterior of the building and interior specific locations shall comply with NEC Section 410-4(a), and light fixtures in ducts or hoods shall comply with Section 410-4(c).

Sheet E2.0

1. All outlets within 6' of sinks/kitchens are required to be GFI protected. Please correct and revise as needed. Reference NEC Section 210-8(b)(3).


ENERGY CODE COMMENTS:

1. The Building Envelope and Mechanical Systems have been reviewed for compliance with 1998 IECC and have been accepted.

2. Provide lighting energy calculations to show that both the interior and exterior lighting energy usage complies with 1998 IECC Section 705 and Table 705.4.


ACCESSIBILITY COMMENTS:

1. The plans have been reviewed and accepted for compliance with 2000 IBC Chapter11, ANSI-117.1 (1998), and ADAAG standards.
07/18/2003 EROSE1 ENGINEERING REVIEW Needs Review
07/18/2003 EROSE1 WWM REVIEW Needs Review
07/18/2003 ELAINE ROSE ZONING REVIEW Needs Review
07/18/2003 EROSE1 FIRE REVIEW Needs Review
07/18/2003 EROSE1 WATER REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
07/15/2003 ELAINE ROSE OUT TO CUSTOMER Completed