Permit Number: T03CM02808
Parcel: 12701008A

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T03CM02808
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/12/2003 JIM TATE ENGINEERING REVIEW Denied A copy of the stamped approved Site Plan must be included in the submittal.
08/15/2003 Robert Sherry MECHANICAL-COMMERCIAL REVIEW Approved
08/18/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Termination of the excess pressure relief line from the hot water storage tank over a service sink (Keynote 6/P1 and Detail 5/P5) is not an approved location. Reference Section 608.5, UPC 1994.
2. The gas line to the WH is shown as 1-1/4" on sheet ME1 and as 1-1/2" on Detail 2/P4. Please coordinate.
3. Provide calculations showing water supply piping is sized in accordance with Section 610.5, UPC 1994. Include all fixtures and water outlets when calculating the total demand and determining pipe sizes. Reference Section 610.1, UPC 1994. The fixture units shown in the calculation on sheet P3 do not come from the 1994 UPC. The Water Pipe Sizing table on sheet P4 does not appear to be correlated to the Plumbing Water Riser diagram on sheet P4.
4. Provide a schedule of waste fixture units for all plumbing fixtures using the values shown in Table 7-3, UPC 1994. Include the total number of each fixture being installed. Reference Section 302.3, Uniform Administrative Code 1997. The fixture units shown in the calculation on sheet P3 do not come from the 1994 UPC.
5. Provide upper terminal cleanouts on horizontal drainage pipe. Reference Section 707.4, UPC 1994. Cleanouts may be omitted only if the horizontal drain line is less than five feet in length.
6. Provide backflow protection at detergent system connection (P4). Reference Section 603.0, UPC 1994.
08/27/2003 Martin Haeberle BUILDING-COMMERCIAL REVIEW Denied 1. Provide calculations for proposed mechanical equipment on roof. Note: Shell building calculations only address HVAC units
2. Provide structural calculations for soffit, glulam beam, and kitchen hood supported from roof trusses. Note: not included in submitted calculations
3. Code analysis data provided is incorrect. Appears to be utilizing early code edition. Revise plans and analysis sheet. Note: A restaurant is an A-2 under the IBC
08/29/2003 MELISSA POULIN WWM REVIEW Approved
09/03/2003 Linda Buczynski ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US
IF YOU CARE TO DISCUSS.

Sheet E2
1. "Locate equipment in Plan View that is to go on Panel "CC", by Panel & Circuit Number. None of the electrical loads appear to be fed from this panel." This comment was made on the first submittal 7/7/03. Response indicated that Panelboard CC is to be provided with kitchen equipment, internally wired and UL listed as part of the complete chef's counter assembly. Panelboard schedule for CC was removed and cut sheet was to be provided. Please provide the cut sheet.

Sheet E4
1. "Provide for a disconnect switch for the rooftop-mounted refrigerator compressor and any other such roof-mounted equipment." This comment was made on Sheet K1 on the first submittal 7/7/03. Disconnects is shown on Sheet K4 as single phase for Refrigerator Compressor and Refrigerator Equipment, which does not coordinate with Sheet ME1 or this Sheet. Show CU-1, CU-2, and CU-3 on Electrical Plan, and their respective disconnects, and provide voltage and amperage ratings of such disconnects, and fusing if that is the intent.
2. "AFC at Panel "CC" is 15,348 per calculations. Yet the Panel, on Sheet E2, is only rated for 10,000A." This comment was made on the first submittal 7/7/03. Please provide the cut sheet.
3. On Circuit K-12,14,16, Walk-In Refrigerator Compressor, it is not clear whether this equipment has a hermetic refrigerant motor compressor. If so, provide overload protection per NEC 440-52. Otherwise Provide overload protection per NEC 430. If the Circuit Breaker has been sized per manufacturer's recommendations, or is thermally protected, state so.
4. On Circuit K-18,20,22, Refrigeration System, it is not clear whether this equipment has a hermetic refrigerant motor compressor. If so, provide overload protection per NEC 440-52. Otherwise Provide overload protection per NEC 430. Otherwise Provide overload protection per NEC 430. If the Circuit Breaker has been sized per manufacturer's recommendations, or is thermally protected, state so.
5. On Circuit K-24,26, Ice Maker Condensing Unit, it is not clear whether this equipment has a hermetic refrigerant motor compressor. If so, provide overload protection per NEC 440-52. Otherwise Provide overload protection per NEC 430. Otherwise Provide overload protection per NEC 430. If the Circuit Breaker has been sized per manufacturer's recommendations, or is thermally protected, state so.
6. On Circuit K-12,14,16, Walk-In Refrigerator Compressor, it is not clear whether this equipment has a hermetic refrigerant motor compressor. If so, provide ground fault and short circuit protection per NEC 440-22. Otherwise Provide overload protection per NEC 430.
7. On Circuit K-12,14,16, Walk-In Refrigerator Compressor, it is not clear whether this equipment has a hermetic refrigerant motor compressor. If so, provide ground fault and short circuit protection per NEC 440-22. Otherwise Provide ground fault and short circuit protection per NEC 430.
09/10/2003 David Rivera ZONING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/12/2003 ANGIE SHOFFSTALL OUT TO CUSTOMER Completed
09/11/2003 ANGIE SHOFFSTALL REJECT SHELF Completed