Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL
Permit Number - T03CM02670
Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/24/2003 | Loren Makus | ENGINEERING | REVIEW | Needs Review | |
07/02/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet C.1 1. Site work note 6 references a soil bearing value of 1500 psf and states "see soils report". Please provide the soils report that was not included with the submittal package. STRUCTURAL COMMENTS Sheet A.1 1. Detail 2/A. indicates a footing schedule is to be referred to for steel reinforcement. No footing schedule has been shown. Please clarify. Sheet A.2 1. Specify the post to beam connection at the entry patio detail 3/A.2. 2. Please coordinate roof assembly specifications between plan and design calculations. Calculations specify ½" oriented strand board which is not consistant with building section A/A.2. Also coordinate roof assembly notes as shown on the elevation drawings (Sheet A.3.). Sheets A.2, M.1 1. Address concentrated loading of rooftop mechanical equipment shown on Sheet M.1 in the framing plan for the roof on Sheet A.2. Ref. IBC 1606.2. PLUMBING COMMENTS Sheet M.1 1. Coordinate with mechanical comment 3. MECHANICAL COMMENTS Sheet M.1 1. Please provide unit weight specifications for the rooftop mechanical equipment for coordination of structural comment regarding concentrated load. 2. Specify outside air provision. Ref. IMC 403. 3. Specify condensate material, size, slope and termination. Ref. IMC 307. ELECTRICAL COMMENTS Sheet E.1 1. The mechanical specifications for the package unit indicate a minimum 25 amp breaker is to be provided. Please coordinate with the electrical panel schedule which shows a 20 amp breaker. ENERGY COMMENTS Sheet E.1 1. Provide the interior lighting power analysis. Ref. IECC 705.4. |
07/03/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
07/03/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
07/03/2003 | EROSE1 | FIRE | REVIEW | Needs Review | |
07/03/2003 | EROSE1 | WATER | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/03/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |