Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-REVISION/OTHER
Permit Number - T03CM02625
Review Name: 3RD PARTY REVIEW-REVISION/OTHER
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/17/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet A-1 1. Please coordinate wall sheathing and finish with structural design criteria. See structural comment 1, Sheet A1. Revise the details if necessary. 2. Provide a landing at the exterior door at the north side of the new addition. Ref. IBC 1003. Ref. IBC 1003.3.1.5. 3. Please clarify if the existing window in the south CMU wall is to be infilled or remain. 4. Please specify provisions for maintaining indoor temperature. Ref. IBC 1203.1. 5. Specify hardware for the egress door compliant with IBC 1003.3.1.8 STRUCTURAL COMMENTS Sheet A-1 1. The exterior wall design loads assume 3/8" plywood with stucco finish. The plan details specify 5/8" T1-11 sheathing only. Please clarify. MECHANICAL COMMENTS Sheet A-1 1. Note provisions for combustion relief air for the existing gas fired water heater. ELECTRICAL COMMENTS Sheet A-1 1. Provide illumination at the exterior door at the north side of the addition. Ref. IBC 1003.2.11. ENERGY COMMENTS General 1. Please submit energy code data. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/18/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |