Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL TI
Permit Number - T03CM02615
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/16/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet A-4 1. Please specify finish material in accordance with IBC 1209.2 for both walls adjacent to water closet. STRUCTURAL COMMENTS General 1. The deferred submittal of the mechanical hood, MH-1, must include load calculations, shop drawings and connections for approval prior to installation. PLUMBING COMMENTS Sheet P-3 1. Expansion tank notes specify Watts DET 12. The plan specifies Amtrol ST-5. Please coordinate. 2. Fixture connections indicate ½" HW to WC. Please revise. 3. A hose bibb is shown in the fixture connection schedule. This hose bibb was not found in the plan or isometric views. Please clarify. 4. Call out for the prep sink indirect waste to the floor sink is not shown in the waste isometric. Ref. UPC 801. 5. Please show indirect waste for the ice machine and walk in cooler in the isometric. Ref. UPC 801. MECHANICAL COMMENTS Sheet M-1 1. Please note that the mechanical hood, MH-1, is a deferred submittal and may not be installed prior to approval. Coordinate with structural general comment 1. ELECTRICAL COMMENTS Sheet E-1 1. The light and fan shown in the new bathroom are noted as existing and to remain. Please clarify. |
07/18/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
07/18/2003 | EROSE1 | FIRE | REVIEW | Needs Review | |
07/18/2003 | EROSE1 | WATER | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/16/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |