Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL TI
Permit Number - T03CM02258
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/27/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
05/27/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
05/27/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet A1.0 1. The occupancy group is described as A-3 in the project information block. The more applicable description of the occupancy group would be A-2. Ref. IBC 303.1. 2. The occupancy load calculation indicates one exit required. The common path of egress travel may not exceed 75 feet. Please address. Ref. IBC 1004.2.5. Sheet A3.1 1. Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. Ref. 1003.3.1.8. 2. Please specify the connection of partition walls at top and bottom. Ref. IBC 1607.13. Sheet A5.0 1. Permanent access and working space provisions must be shown for the water heater if above ACT specified at 13'-0" A.F.F. Ref. UPC 511. Sheet A6.2 1. Provide clearance at water closet. Ref. ANSI A117.1, 604.3. 2. Note the coat hook height at 48" A.F.F. Ref. ANSI A117.1, 604.8.5. Sheet A7.5 1. Detail access and working space for the water heater. Ref. UPC 511. STRUCTURAL COMMENTS - The structural portion has been reviewed and approved. PLUMBING COMMENTS Sheet P1.0 1. In the piping specifications, indicate specifically that PVC piping must be PVC DWV. Ref. UPC 701. 2. Please provide specifications for an expansion tank as shown on sheet P3.0 for the water heater. Ref. UPC 608.3. 3. Specify cross connection control for the P358 hose bibb. Ref. UPC 603 Sheet P3.0 1. Show the cleanouts for the second toilet room. Ref. IMC 403.3. MECHANICAL COMMENTS Sheet M2.0 1. Provide mechanical exhaust for second toilet room. Ref. IMC 403.3. 2. Please clarify the keynote suggesting condensate drainage to the toilet rooms. Condensate disposal appears to be handled as indirect waste to the floor sink. Coordinate with HVAC notes which specify mop sink. Ref. UPC 801. 3. Specify condensate disposal provisions for condenser serving ice machine. Ref. IMC 307.2. ELECTRICAL COMMENTS Sheet E7.0 1. Circuit 26 on panel 2D1 was not identified on the power plan. Please clarify. 2. Coordinate the location of wiring and sensor for circuit 20, panel 2D1 with mechanical. Ref. IMC 606. ENERGY COMMENTS General 1. Please provide the interior lighting power analysis. Ref. IECC Table 705.4. |
05/27/2003 | EROSE1 | WATER | REVIEW | Needs Review | |
05/27/2003 | EROSE1 | FIRE | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/27/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |