Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL TI
Permit Number - T03CM02224
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/22/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
05/22/2003 | EROSE1 | ENGINEERING | REVIEW | Needs Review | |
05/22/2003 | EROSE1 | FIRE | REVIEW | Needs Review | |
05/22/2003 | WILDAN | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | GENERAL COMMENTS 1. This project has been reviewed for conformance with the 2000 IBC, 1997 UAC, 2000 IMC, 1998 IECC, 1999 NEC codes with local modifications and the 1994 UPC with State of Arizona amendments. Any revisions to this plan will require an additional review and approval by Willdan. ARCHITECTURAL COMMENTS: Sheet A-2 1. A roof slope is not identified for the new metal roof structure. Please review and clarify. Reference IBC Section 1507.4. 2. A flashing detail is not provide for the steel braces that penetrate the new metal roof. Please review and clarify. Reference IBC Section 1503.2. 3. Please coordinate roof plan dimensions with the structural drawings. Reference IBC Section 106.1.1. STRUCTURAL COMMENTS: Sheet S1.1 1. No new masonry construction is shown on the structural drawings. Please review general structural notes and delete all notes not applicable to the work proposed. Coordinate with the architect and the City of Tucson special inspection document. Reference IBC Section 106.1.1. 2. Soils special inspection is required. Please add to the special inspection list and provide the required City of Tucson document for soils special inspection. Reference IBC Sections 1704.4 and 1704.1.1. Sheet S2.1 1. The new roof structural supporting elements are not dimensioned as to location or length. Please review and provide dimensioned plans. Reference IBC Section 106.1.1. Sheet S3.1 1. Connections for the new roof elements to the existing car wash wall are not shown in Detail 104. Please review and clarify. Reference IBC Section 106.1.1. 2. The new metal roof edge angle location is not dimensioned in Detail 106. Please review and clarify. Reference IBC Section 106.1.1. 3. The architectural drawings show a new steel roof canopy on the west side of the existing car wash. However, the structural plans do not show any of the required structural details. Please review and clarify. Reference IBC Section 106.1.1. PLUMBING COMMENTS 1. The plumbing portion has been reviewed and accepted. MECHANICAL COMMENTS 1. The mechanical portion was not part of this review. ELECTRICAL COMMENTS 1. The electrical portion has been approved and accepted. ENERGY COMMENTS 1. The energy portion was not part of this review. ACCESSIBILITY COMMENTS 1. The accessibility portion was not part of this review |
05/22/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
05/22/2003 | EROSE1 | WATER | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/22/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |