Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-REVISION/OTHER
Permit Number - T03CM02077
Review Name: 3RD PARTY REVIEW-REVISION/OTHER
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/06/2003 | WILDAN | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | The initial review for the above project has been completed. This letter reflects comments which need to be addressed by a written response to each, indicating action taken. In order to facilitate a shorter back-check time, we request that you please provide two (2) sets revised plans and calculations, highlighting any changes with appropriate revision number, revision date and "cloud bubbles." Please return redline drawings with your resubmittal. Occupancy Occup. Load Construction Area S.F. Sprinklered Alarms A-2 No Change V-B, A.S. 6,066 Yes Yes GENERAL COMMENTS: 1. The shop drawings for the roof trusses shall be reviewed to the adopted 2000 IBC with City of Tucson Amendments. ARCHITECTURAL COMMENTS: The architectural portion was not a part of this review. STRUCTURAL COMMENTS: 1. The shop drawings shall first be reviewed by the Structural Engineer or Architect of Record for the building, and their Shop Drawing Review Stamp affixed to the plans and calculations. Then, returned to Willdan for completion of the review and approval for the City. Reference IBC Section 106.3.4.1. PLUMBING COMMENTS: The plumbing portion was not a part of this review. MECHANICAL COMMENTS: The mechanical portion was not a part of this review. ELECTRICAL COMMENTS: The electrical portion was not a part of this review. ENERGY CODE COMMENTS: The energy code portion was not a part of this review. ACCESSIBILITY COMMENTS: The accessibility portion was not a part of this review. |