Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL
Permit Number - T03CM01892
Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/01/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
08/01/2003 | EROSE1 | ENGINEERING | REVIEW | Needs Review | |
08/01/2003 | WILDAN | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | GENERAL COMMENTS: 1. This project has been reviewed for conformance with the 2000 IBC, 1997 UAC, 2000 IMC, 1998 IECC, 1999 NEC codes with local modifications, and the 1994 UPC with State of Arizona amendments. Any revisions to this plan will require an additional review and approval by Willdan. ARCHITECTURAL COMMENTS: Not part of this review. STRUCTURAL COMMENTS: Page 3 and 4 of 8 1. The foundation drawing does not identify the allowable soil bearing pressure and requires that the geotechnical engineer for the building soils report confirm the design soil parameters for the proposed tower foundation located 7 feet below grade. Given the close proximity of the existing building, sealed drawings for sheeting, shoring, and bracing are required. Please review and clarify. Reference IBC Sections 106, 1802.6, and 1805.2.2. 2. Signed and sealed foundation design calculations have not been provided. Please provide with your resubmittal. Reference IBC Sections 106 and 1604.4. 3. The design loads shown for the foundation do not appear to have been increased for the essential facility category. Please review and clarify. Reference IBC Section 1604.4. PLUMBING COMMENTS: Not part of this review. MECHANICAL COMMENTS: Not part of this review. ELECTRICAL COMMENTS: Not part of this review. ENERGY CODE COMMENTS: Not part of this review. ACCESSIBILITY COMMENTS: Not part of this review. Sincerely, WILLDAN Michael J. Brown, C.B.O. Building Official MJB/kms F:\Tucson Office\09058\2003\3133tp02.doc Documents to be Transmitted Back To Architect, via Airborne Express: 1. 2-copies of Architect's Drawing: Sheet 1 - New Microwave Tower 2. 2-copies of Valmont Design Document Package consisting of: Tower Calculations Page 3 with importance factor of 1 2000 IBC Seismic Check Bill of Materials Detail Drawings Insulation Pipe Mount Mark Antennas, 6-foot, 8 & 10-foot, 4-foot Drawings Page 1 through 8 3. 2-copies of Geotechnical Report |
08/01/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
08/01/2003 | EROSE1 | WATER | REVIEW | Needs Review | |
08/01/2003 | EROSE1 | FIRE | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/01/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |