Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T03CM01891
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/07/2003 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
| 05/13/2003 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 05/13/2003 | TERRY STEVENS | BUILDING-RESIDENTIAL | REVIEW | Denied | PLAN CHECK COMMENTS - PROJECT #T03CM01891 05/14/03 PLAN REVIEW FOR THE ABOVE REFERENCED STRUCTURE HAS BEEN COMPLETED. THIS LETTER REFLECTS COMMENTS TO BE ADDRESSED. IN ORDER TO FACILITATE A SHORTER BACK CHECK TIME, WE REQUEST THAT YOU PLEASE PROVIDE REVISED PLANS AND CALCULATIONS, HIGHLIGHTING ANY CHANGES, ALONG WITH A WRITTEN RESPONSE TO EACH OF THE NOTED ITEMS INDICATING ACTION TAKEN. GENERAL REQUIREMENTS: 1. ALL CORRECTIONS AND REVISIONS SHALL BE MADE ON THE ORIGINAL TRACINGS AND TWO NEW SETS OF PRINTS OR (1) SEPIA & (1) BLUE LINE SHALL BE RETURNED ALONG WITH ALL REDLINE PRINTS. 2. PEN OR PENCIL CORRECTIONS ON FINAL PRINTS WILL NOT BE ACCEPTABLE. TO AVOID DELAYS ENSURE ALL CORRECTIONS HAVE BEEN MADE, ARE COMPLETE AND HAVE BEEN COORDINATED ON ALL APPLICABLE DETAILS AND NOTES. FOUNDATION PLANS: 1. ALL FOUNDATION HOLD-DOWNS FOR SHEAR WALLS SHALL BE SPECIFIED AND LOCATED -------PAHD42 HOLD DOWN USED WITHIN 8" OF A CORNER DOES NOT GIVE THE 1800# UPLIFT REQUIRED-------A HPAHD22 MEETS THIS REQUIREMENT FLOOR PLAN: 1. WINDOW AT LANDING IN STAIRWAY IS REQUIRED TO BE TEMPERED GLASS STRUCTURAL PLANS: 1. COMPLETELY DETAIL ALL CONNECTIONS AND CROSS-REFERENCE TO THE FOUNDATION AND FRAMING PLANS: - BEAM TO POST-----MISSING FOR PORCHES 2. PLANS AS SUBMITTED DO NOT MEET THE ALTERNATIVE BRACED WALL DESIGN-------SEE BELOW PROVIDE BRACING DETAILS AND NOTES FOR EXTERIOR FRAME WALLS AND MAIN CROSS-STUD PARTITIONS, OR USE FULLY BRACED, PER R602.10.3. A MINIMUM PANEL WIDTH OF 48" IS REQUIRED TO EFFECTIVELY BRACE THE PARTITION. SEE TABLE R602.10.3, CATEGORY "C". IF BRACING DOES NOT COMPLY, PROVIDE A LATERAL ANALYSIS OR ALTERNATE DESIGN TO BE REVIEWED BY THE PLANS EXAMINER. WIND FORCES FOR SINGLE STORY RESIDENCES SHALL USE 90 MPH, EXPOSURE "B". TWO STORY RESIDENCES OR AREAS OF HIGHER WIND SHALL USE EXPOSURE "C". SECTIONS - DETAILS - MISC. NOTES: 1. ON STANDARD DETAIL SHEETS, CROSS-OUT ALL DETAILS THAT DO NOT APPLY OR WERE NOT USED. 2. DETAIL CROSS REFERENCES ON FRAMING PLAN INDICATE WRONG PAGES------CLARIFY PLUMBING PLANS: 1. PROVIDE AN ISOMETRIC DRAWING OF WASTE LINES. REQUIRED FOR 2 STORY STRUCTURES 2. THE CITY OF TUCSON HAS NOT ADOPTED THE PLUMBING SECTION OF THE IRC 2OOO. THE CURRENT CODE BEING USED IS THE 1994 UPC WITH THE STATE AMENDMENTS. ALL PLANS MUST REFERENCE TO THIS CODE. ELECTRICAL PLANS: 1. PROVIDE AN EXTERIOR OUTLET AT GRADE LEVEL LOCATED AT BOTH THE FRONT AND BACK OF THE DWELLING, PER E3801.7. THESE OUTLETS SHALL BE GFI PROTECTED PER E3802.3. IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT YOUR ASSIGNED PLANS EXAMINER: TERRY STEVENS @ 791-5550 EXT. 112 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/15/2003 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |
| 05/14/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |