Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-REVISION/OTHER
Permit Number - T03CM01889
Review Name: 3RD PARTY REVIEW-REVISION/OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/16/2003 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | GENERAL: q Provide a copy of the shell building plans and the energy design for the building. Any work affecting the energy design must be shown on the T.I. plans including window ratings. ARCHITECTURAL: q Sheet A101: What is the door # of the double door at grids Q-24? Plan review assumes door #4. q Sheet A101: Clarify by note that door # 5 will swing open 180 degrees to allow exit discharge away from the truck ramp. q Sheet A101: Section details do not indicate how the energy envelope is to be provided or maintained. Typical all plan sheets. q Sheet A101: Specify the use of the mezzanine/second floor area. q Sheet A701: Detail clear space at entrance to door # 20 in compliance with ANSI A117.1-98 Figure 404.2.4.1(e). The projection of the corridor doorway opening is in this required clear space. q Sheet A701: Revise elevations D and C to reflect location of toilet paper dispenser in compliance with ANSI A117.1-98 Figure 604.7. q Sheet A702: Show locations and specify type of safety glazing for glass walls. q Sheet A801: Revise hardware set for doors 5 and 9 to reflect single door. q Sheet A801: Add note at hardware sets indicating the use of lever style lock/latch sets. STRUCTURAL: q There are no structural comments. MECHANICAL: q There are no structural comments. PLUMBING: q Sheet P701: Provide trap primers for floor drain traps. q Sheet P701: Clarify plumbing fixtures WC-1 and WC-2 have open front seats. ELECTRICAL: q Sheet E401: Relocate the exit sign from above door # 25 to exit door # 9 in the north wall. q Sheet E401: Clarify by note that emergency powered egress illumination will produce 1 foot-candle illumination at floor in compliance with IBC Sections 1003.2.11.2 and 1003.2.11.3. Also recheck the areas adjacent to doors # 1 and # 9. q Sheet E401: Provide emergency egress illumination for the area immediately exterior of the exit doors. See IBC Section 1003.2.11.2.4. q Sheet E703: Light Fixture Schedule; Clarify by note that the Bodine Unit Inverters are battery backup power units or clarify how emergency power is provided. q Sheet E801: Add notes to specify that all flexible conduit systems shall contain an equipment grounding conductor as required by the City amendments to the 1999 NEC. -End of Review- |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/16/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |