Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T03CM01877
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/09/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 05/09/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide calculations to show that connecting the water supply for the new building to the existing water supply piping will not adversely affect the existing buildings. Reference Section 302.3, Uniform Administrative Code 1994. 2. Correct installation of P-2 and P-3 to conform to Section 908.1, UPC, 1994. 3. Termination of the excess pressure relief from the water heater over a mop sink is not approved location. Reference Section 608.5, UPC, 1994. 4. Provide vent piping of sufficient size to comply with Section 904.1, UPC. 5. Provide calculations and sizes of scuppers and downspouts. Reference Appendix D, UPC. |
| 05/09/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Coordinate the exhaust volume scheduled for EF-3 with the exhaust volumes shown on the floor plan. |
| 05/09/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 05/20/2003 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | see comment under T03CM01875 |
| 05/28/2003 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 06/03/2003 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. MPR does not reflect the required fixtures per Table 2902.1 IBC. Note: A total fixture count and occupant load of the school may be used if the total is in compliance with Table 2902.1 IBC. 2. Provide occupant loads on the plans for the MPR building. Note, a 7 net ratio is to be used for the assembly area. Reference Table 1003.2.2.2 IBC 3. The urinal is to be accessible per section 1108.2 IBC 4. Weep screed is not shown on plans for the stucco system. Reference section 2512.1.2 IBC. Revise plans 5. Overflow for the roof leader appears to be undersized. Provide calculations for sizing of overflow. 6.Ceiling Plan shows lay-in tile and bathroom cross-section indicates drywall. Please clarify. Note attic ventilation required if drywall. 7. Kitchen expansion appears to eliminate one path of egress. Please clarify impact on egress system. 8. Is a roof going on the expansion? Please clarify Provide roof plan |
| 06/05/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/12/2003 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 06/06/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |