Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T03CM01645
Parcel: 128100800

Review Status: Completed

Review Details: 3RD PARTY REVIEW-REVISION/OTHER

Permit Number - T03CM01645
Review Name: 3RD PARTY REVIEW-REVISION/OTHER
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/16/2003 WILDAN 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied GENERAL COMMENTS:

1. This project has been reviewed for conformance with the 2000 IBC, 1997 UAC, 2000 IMC, 1998 IECC, 1999 NEC codes with local modifications, and the 1994 UPC with State of Arizona amendments. Any revisions to this plan will require an additional review and approval by Willdan.

2. The submittal documents prepared by the structural engineer for the manufactured roof structural members show no evidence of having been reviewed by the project structural engineer. Deferred design submittals for structural designs prepared by the manufacturer of structural components shall first be reviewed and accepted by the design registrant in responsible charge for the building structure before submittal to the building official. Please review and when accepted, resubmit with proper notation on the submittal documents prepared by the manufacturer's engineer. Reference IBC Section 106.3.4.2.

3. With your resubmittal, please provide the approved permit drawings for the proposed Baja Fresh tenant improvement. Reference IBC Section 106.


STRUCTURAL COMMENTS:

1. The roof sketch indicating the revised loads for the design of the manufactured structural roof elements do not indicate any loads or method of support for the required kitchen hoods. Please review, coordinate, and clarify. Reference IBC Section 1606.2.

2. Please clarify that the motor driven equipment weights have been increased 20%. Reference IBC Section 1607.8.2

Final Status

Task End Date Reviewer's Name Type of Review Description
07/16/2003 ELAINE ROSE OUT TO CUSTOMER Completed