Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/21/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
04/21/2003 | WILDAN | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | GENERAL COMMENTS: 1. This project has been reviewed for conformance with the 2000 IBC, 1997 UAC, 2000 IMC, 1998 IECC, 1999 NEC codes with local modifications and the 1994 UPC with State of Arizona amendments. Any revisions to this plan will require an additional review and approval by Willdan. 2. Please clarify the "boxed" note under General Notes to show that the contractor shall only building from plans approved by the City of Tucson and being appropriate approval stamps on each and every sheet, per City of Tucson Policy and Registrations. 3. Please correct the "Applicable Codes" under "Project Code Summary" as noted in Comment #1 above. ARCHITECTURAL COMMENTS: Sheet A200 1. With a calculated occupant load of 93 in the retail area, a minimum of two means of egress shall be required in accordance with 2000 IBC Table 1004.2.1. Since 2000 IBC, Section 1004.2.3 prohibits egress through storage rooms and similar uses, the second means of egress from the retail area shall not be through a storage room as shown. Provide an exit corridor to the rear exit door for the second means of egress in accordance with 2000 IBC, Section 1004.2.2.1. 2. Verify on Keynote #25 that the existing drinking fountain is compatible with 2000 IBC, Chapter 11 and ADA Accessibility requirements. Sheet A600 1. At the toilet rooms clarify the requirement for a 48" high wainscoat within 2'-0" each side and behind the water closets in accordance with 2000 IBC Section 1209.2. 2. Clarify at the toilet rooms that the base shall extend a minimum of 6" above the floor on the walls in accordance with 2000 IBC, Section 1209.1. STRUCTURAL COMMENTS: 1. The structural applicable details have been reviewed and accepted. PLUMBING COMMENTS: Sheet M100 1. At the Waste and Vent Isometric Diagram #3, there is an extraneous 4" hanging out in mid-air. Please correct/clarify. MECHANICAL COMMENTS: Sheet M200 1. At Keynote #4, please clarify that all duct seams, joints and connections shall be sealed with approved tape or mastic in accordance with 2000 IMC, Section 603.8. 2. At Keynotes 7 and 8 and the Mechanical Plan and Electrical Plans, please coordinate and clarify which VAV is #1 and which is #2, including where the duct smoke detector is required. 3. Keynote #2 appears to be in an inappropriate location on the Mechanical Plan. It is at a wall not a door? Please resolve. Sheet M300 1. At specification 15500.E.8, please clarify as noted in comment #1 on Sheet M200 in accordance with 2000 IMC, Section 603.8. ELECTRICAL COMMENTS: Sheet E300 1. Please coordinate with the Mechanical Plans and Mechanical Comment #2 on Sheet M200 to clarify which VAV is #1 and #2 and where the duct smoke detector is to be located. ENERGY CODE COMMENTS: 1. The building envelope is existing and not being modified and is therefore exempt per 1998 IECC, Section 101.4.2.1. 2. Sheet E120 panel schedule A indicates the lighting energy is 29,471 watts per s.f. 1998 IECC, Table 705.4 only allows 3.1 watts per s.f. for the entire tenant portion of the building as shown the lighting energy is 78 watts per s.f. Please revise to show compliance. ACCESSIBILITY COMMENTS: 1. The plans have been reviewed for ADA and 2000 IBC, Chapter 11 accessibility requirements and accepted. |
04/21/2003 | EROSE1 | WATER | REVIEW | Needs Review | |
04/21/2003 | EROSE1 | FIRE | REVIEW | Needs Review | |
04/21/2003 | EROSE1 | NPPO | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/21/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |