Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE
Permit Number - T03CM01421
Review Name: RESUBMITTAL - SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/28/2003 | Patricia Gilbert | ENGINEERING | REVIEW | Denied | DATE: July 30, 2003 ACTIVITY NUMBER: T03CM01421 PROJECT NAME: Mohave Road Apartments PROJECT ADDRESS: 102 East Mohave Road PROJECT REVIEWER: Patricia Gilbert The following items must be revised or added to the site plan. Please include a response letter with the next submittal that states how all comments have been addressed. RESUBMITTAL REQUIRED: SITE PLAN AND A REVISED DRAINAGE REPORT OR AN ADDENDUM TO THE DRAINAGE REPORT. DRAINAGE REPORT 1. Please specify the minimum finish floor elevation (FFE) for the structures. The elevations on the Site and Grading Plans are NAVD 88. The elevations specified in the Drainage Report appear to be NGVD 29. Apply the proper conversion. The recommended elevation should be in NAVD 88. The FFE must be a minimum of one foot above the 100-yr. peak WSEL. |
| 07/31/2003 | JIM EGAN | FIRE | REVIEW | Denied | An approved fire apparatus access roadway must be provided and extended to within 150 feet of all portions of exterior walls of all structures. |
| 08/21/2003 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | REVISE THE LANDSCAPE PLAN TO INCLUDE A SUMMARY OF PLANTS REQUIRED TO MEET NPPO REQUIREMENTS. DS 2-15.3.4.B LOCATE AND IDENTIFY ON THE LANDSCAPE PLANS ANY PLANTS REQUIRED AS DETERMINED BY THE NPPO PLAN. REVISE THE LANDSCAPE PLAN TO PROVIDE A FIVE-FOOT HIGH SCREEN ALONG MOHAVE STREET AT THE REAR OF THE STREET LANDSCAPE BORDER. LUC TABLE 3.7.2-I |
| 08/21/2003 | JOE LINVILLE | NPPO | REVIEW | Denied | SEE LANDSCAPE COMMENTS |
| 08/26/2003 | DAN CASTRO | ZONING | REVIEW | Denied | COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. CODE SECTION/ DEVELOPMENT STANDARD 1. Demonstrate how each unit will connect to the on-site pedestrian circulation system. The plan does not provide for a continuous pedestrian circulation path (sidewalk) to each unit. In addition, provide disabled pedestrian access paths to buildings from public right-of-way and disabled access aisles. The accessible route may be identical to the pedestrian circulation path (D.S. 2-08.3.1) (D.S. 2-02.2.1.A12) 2. Detail handicapped parking and disabled access aisle. Detail access ramps. (D.S. 2-02.2.1.A.8) 3. All requested changes must be made to the site and landscape plans. (D.S. 2-07.2.1.A) 4. The resubmitted plan may be reviewed at the counter for Zoning Review compliance. Please contact me at the number below to set an appointment. If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/23/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 08/26/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |