Permit Number: T03CM01365
Parcel: 132150040

Address:
750 E EVANS BL

Review Status: Completed

Review Details: SITE

Permit Number - T03CM01365
Review Name: SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/01/2003 JIM EGAN FIRE REVIEW Approved
08/14/2003 Doug Williams ENGINEERING REVIEW Denied SUBJECT: Site and Drainage Report Review
REVIEWER: Doug Williams
DATE: 15 August 2003
ACTIVITY NUMBER: T03CM01365
T14S, R14E, Section 30
SUMMARY: Engineering Section has reviewed the Site Plan and Drainage Report resubmittal received August 14, 2003. Comments from the June 12, 2003 Engineering review have not been adequately addressed. Approval is not recommended at this time - resubmittal is required. Please address the following comments listed below, and provide a response letter specifically addressing each comment.

Drainage Report:

1. Please refer to drainage report content and format requirements outlined in the City of Tucson's Standards Manual for Drainage Design and Floodplain Management (SMDDFM) - City of Tucson Development Standard (D.S.) 10-02.0, section 2.3. The submitted report does not address/discuss some of the required components, outlined below:
a) Address offsite and onsite drainage characteristics in accordance with sections 2.3.1.3 A (2, 3, & 6) and B 2 (DS 10-02.0);
b) Address/discuss the technical items listed in section 2.3.1.4 C 2, 3 & 4 (DS 10-02.0);
c) Provide detention basin design requirements, including basin and basin outlet weir details and dimensions, fully labeled and discussed in the report. Specific attention should be given to the items outlined in sections 2.3.1.6 A 4 a & e, B, and C, and sections III and V of the Pima County/City of Tucson Stormwater Detention/Retention Manual (DS 10-01.0). Please note that historic discharge location and fashion should be replicated as closely as possible.
d) Describe and provide hydraulic calculations for the proposed swale along the western property line, to include a cross section of the swale dimensions, per section 2.3.1.5 C (DS 10-02.0);
e) Please provide the summaries to be included in the basin checklist for the annual inspection report, in accordance with section 2.3.1.6 C 2 a & b (DS10-02.0);
f) Provide a soils report containing the items listed in section 14.2.6 (DS 10-02.0);

SITE PLAN COMMENTS:
a) Please revise the refuse container dimensions to meet the minimum width and depth dimensions outlined in Development Standard 6-01.4.2 (D.S. 6-01.0);
b) Provide sidewalk scuppers for a minimum of 10-year flow conveyance under sidewalk areas (D.S. 2-08.4.1 E and 3-01.4.4 F2).

GRADING PLAN COMMENTS:
a) A grading permit will be required for this project. Please complete a grading permit application and submit with the resubmittal. Estimated earthwork quantities must be provided with the permit application prior to submittal;
b) Include general grading/construction notes, in accordance with Chapter 36, 2000 IBC (excavation and grading). The consultant should direct special attention to the sections pertaining to cuts, fills, grading setbacks, slope treatments and geotechnical report requirements and recommendations. This document may be accessed at www.ci.tucson.az.us/dsd - go to "codes and ordinances", "building codes", and "2000 International Building Code, (click on) local amendments";
c) Provide a legend, cross-sections fully labeled and dimensioned for the basin and each perimeter, grading limits and slope treatments with reference to riprap average diameter (D50) and thickness (t).
d) Include basin, drainage swale and scupper details, fully dimensioned, and labeled.

Please note that subsequent comments may be forthcoming, upon review of a formal grading plan/permit application and submittal.

If you have any questions, I can be reached at 791-5550, ext. 1189 or Dwillia1@ci.tucson.az.us.

Douglas Williams
Sr. Engineering Associate
Engineering Division
Development Services Department
08/18/2003 Doug Williams SANITATION REVIEW Denied See Engineering folder comments
08/25/2003 David Rivera ZONING REVIEW Approved
08/27/2003 DAVID RIVERA NPPO REVIEW Passed
08/28/2003 JOE LINVILLE LANDSCAPE REVIEW Approved
09/02/2003 DAVID RIVERA HANDICAP-SITE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/03/2003 DELMA ROBEY OUT TO CUSTOMER Completed
09/02/2003 DELMA ROBEY REJECT SHELF Completed