Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL TI
Permit Number - T03CM01278
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/05/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
| 05/05/2003 | EROSE1 | NPPO | REVIEW | Needs Review | |
| 05/05/2003 | EROSE1 | FIRE | REVIEW | Needs Review | |
| 05/05/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet A.1 1. Keynote 15, which appears to reference detail 18/A.7, has been misidentified as the walk-in box wall surface. Please revise. 2. Keynote 20, shown on the plan, is not specified in the keynotes. Please clarify. 3. Please specify the method of attachment to the foundation and to the structure above for wall types keynoted 1 and 2. Ref. IBC 1607.13 4. Thresholds for door types 1 and 2 may not exceed 1/2", note the maximum slope may not exceed 50%. Ref. IBC 1003.3.1.6. 5. Hardware type 2A for door type 4 was not specified in the hardware schedule. Please clarify. 6. Provide means of egress illumination. Ref. IBC 1003.2.11. Please coordinate with electrical plans for primary and emergency power requirements. Sheet A.2 1. Keynote 8, shown in the north elevation adjacent to the electrical service, has a drafting error with respect to the leader line. Sheet A.4 1. Please revise the roof access hatch keynote reference to correspond with the keynote description. Sheet A.5 1. Reference structural detail 105/5.5 at detail 3/A.5 for clarity. Sheet A.6 1. The keynote for the new awning appears to be mislabeled. Keynote 7 is referenced on the plan but keynote 9 refers to the awning. Sheet A.7 1. Please specify a maximum threshold height of 1/2" and maximum bevel of 50% at detail 8/A.7 and detail 9/A.7. Ref. 1003.3.1.6. Sheet K.2 1. Clarify weather protection for the roof mounted ice maker remote condenser. STRUCTURAL COMMENTS Sheet S.4 1. Beam call outs on the roof framing plan appear to have reversed the locations of the B1 and B2 beams with the information provided in the structural calculations. Please revise for clarity. PLUMBING COMMENTS Sheet P1.1 1. Provide specifications for GTI grease interceptor. Ref. UPC 1011. Sheet P1.2 1. Please show the 1 1/4" gas lines that go to the new ovens . Sheet P2.1 1. Please show the cleanouts for the toilet room lavatories. Ref. UPC 707.4. 2. Coordinate A/C unit numbers with the equipment schedule for 2/P2.1. MECHANICAL COMMENTS Sheets M1.2, P1.2 1. Please note that condensate disposal piping will have a minimum 1% slope in the direction of discharge. Ref. IMC 307.1. Sheet M1.1 1. Show provisions for smoke detection systems control. Ref. IMC 606. ELECTRICAL COMMENTS Sheet E.2 1. Please provide the interior lighting power analysis. Ref IECC Table 705.4. 2. Circuit B39 via time switch was not found. Please clarify. 3. Please coordinate with architectural comment 6, Sheet A.1. Ref. IBC 1003.2.11. ENERGY COMMENTS 1. See architectural comment 6, Sheet A.1 and electrical comment 3, Sheet E.2. |
| 05/05/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
| 05/05/2003 | EROSE1 | ENGINEERING | REVIEW | Needs Review | |
| 05/05/2003 | EROSE1 | WATER | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/05/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |