Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T03CM01278
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/14/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 03/25/2003 | PGILBER1 | FLOODPLAIN | REVIEW | Denied | Please see Engineering Folder for Floodplain comments. |
| 03/25/2003 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | DATE: March 25, 2003 ACTIVITY NUMBER: T03CM01278 PROJECT NAME: Peter Piper Pizza PROJECT ADDRESS: 4120 N. Oracle Rd. PROJECT REVIEWER: Patricia Gilbert The following items must be revised or added to the site plan. Please include a response letter with the next submittal that states how all comments have been addressed. RESUBMITTAL REQUIRED: SITE PLAN SUBMITTAL REQUIRED: DRAINAGE REPORT INCLUDE A SOIL'S PRECOLATION TEST. 1. Label and dimension the future sight visibility triangles. 2. Oracle Rd. is a street with a raised median, which requires a pedestrian sight visibility triangle (SVT). Dimension the pedestrian SVT for the far side of the ingress/egress to Oracle Rd. DS 3-01. figure 16. 3. Currently the ingress/egress to the adjacent property, Lucky Wishbone, scales at 20'. The minimum width for two way traffic is 24'. Please dimension the ingress/egress per the Development Standard 3-05.2.1.C. 4. Dimension the existing and future MS&R Right-of-Way for Oracle Rd. DS 2-02.2.A.19. 5. Label and dimension existing sidewalks from the street center line. If there is no existing sidewalk, per the Major Streets and Routes Plan, 6' sidewalks are required for the entire length of the street frontage. Between the front of sidewalk and back of curb a 3' space is required. DS 2-02.2.A.21. 6. Provide the cross-access agreement for the use of Lucky Wishbone's property to access the dumpster. Is the access to the dumpster one way? 7. Written approval from Solid Waste is required for the proposed dumpster location. 8. Dumpster enclosures must have gates. Show the gates on detail number 9 sheet C.3. DS 6-01.4.2.B. 9. Add a note on the plan, "All roof down spouts on all structures must be routed under any adjacent sidewalk." Sidewalks must be flood free for up to the 10-yr. event. DS 2-08.4.1.E 10. On sheet C.2 Paving and Grading note 7 should read Chapter 36 of the IBC. 11. The runoff coefficients on sheet C.2, the retention calculations are incorrect. The 5 year coefficients must be used. DRAINAGE REPORT 1. The drainage report must address 5 year threshold retention. 2. Drainage reports must be prepared by a Registered Professional Civil Engineer. Standards Manual for Drainage Design and Floodplain Management, SMDDFM, 2.3.1.1.F. |
| 03/25/2003 | PATRICIA GILBERT | SANITATION | REVIEW | Denied | 1. Provide the cross-access agreement for the use of Lucky Wishbone's property to access the dumpster. Is the access to the dumpster one way? 2. Written approval from Solid Waste is required for the proposed dumpster location. 3. Dumpster enclosures must have gates. Show the gates on detail number 9 sheet C.3. DS 6-01.4.2.B. |
| 04/09/2003 | DAN CASTRO | ZONING | REVIEW | Denied | COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. CODE SECTION/ DEVELOPMENT STANDARD 1. Per D.S. 3-05.2.2.D, the back-up spur must have a minimum three (3) foot radii. Revise detail on sheet C.3 as required. (D.S. 2-02.2.1.A.8) 2. Per LUC 3.3.4 "Food Service", 50% of the required bicycle parking must be Class I and 50% must be Class II. Revise general note 12 on sheet c.1 and provide a fully dimensioned typical parking space detail for a Class I bicycle parking space. (D.S. 2-02.2.1.A.9) 3. Provide directional signage for the bicycle parking spaces. (D.S. 2-02.2.1.A.9) 4. Label and dimension existing and future sight visibility triangles. (D.S. 2-02.2.1.A.10) 5. Dimension the width of the ingress/egress point and driveway providing access to and from the shopping center to the south. (D.S. 2-02.2.1.A.11) 6. Provide a copy of the recorded cross access agreement. (D.S. 2-02.2.1.A.11) 7. Revise keynote 9 to reflect the loading space size as noted under general note 13 (12' x 35'). (D.S. 2-02.2.1.A.14) 8. Label and dimension the existing and future ½ right-of-way for Oracle Road. (D.S. 2-02.2.1.A.19) 9. If applicable, all existing or proposed easements must be shown on the plan including width, type, and recording docket and page reference. (D.S. 2-02.2.1.A.20) 10. Label and dimension existing and future MS&R curb location for Oracle Road. (D.S. 2-02.2.1.A.21) 11. Under general note number five (5), please add Sec. 3.5.13.5 as an applicable "subject to" section for Food Service. (D.S. 2-02.2.1.A.31) 12. Provide the building area expansion calculation. (D.S. 2-02.2.2.A.6) 13. All requested changes must be made to the site and landscape plans. (D.S. 2-07.2.1.A) If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608. |
| 04/09/2003 | DAN CASTRO | HANDICAP-SITE | REVIEW | Approved | |
| 04/11/2003 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | 1) Future sight visibility triangles and the relationship to proposed landscaping should be considered at this time. Plants that will, upon maturity, greatly exceed the height limitations should be located outside of the future svt's. Plants of concern include leucophyllum laevigatum, caesalpina mexicana, and celtis pallida. Show the future svt's on the landscape plans and locate plantings as necessary to avoid any visibility conflicts. Also consider the visual impact of the celtis pallida on the existing monument sign. 2) Identify T3 on the plant list. List quantities for each species. DS 2-07.2.2 3) Screening is required for the refuse storage enclosure opening. LUC Table 3.7.2-I 4) Per LUC 3.7.2.4.A.3 "the area between the right-of-way line and sidewalk and the area between the sidewalk and the curb, if not covered with vegetation, shall be covered with an appropriate inorganic ground cover, such as decomposed granite." Revise the plans to indicate the required right of way area improvements. |
| 04/11/2003 | JOE LINVILLE | NPPO | REVIEW | Approved | Exception, LUC 3.8.3.5.D. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/11/2003 | LISA LESNY | OUT TO CUSTOMER | Completed |