Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-RESIDENTIAL
Permit Number - T03CM01247
Review Name: 3RD PARTY REVIEW-RESIDENTIAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/17/2003 | JIM TATE | ENGINEERING | REVIEW | Approved | Flood Use Permit No. T03OT00540 |
06/30/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
06/30/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
06/30/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS General 1. Provide drawings drawn to scale to verify code compliance of dimensional requirements. Sheet 3 1. Please specify moisture resistive surface for shower space to a height of 6 feet above finished floor. Ref. R307. 2. Provide construction dimensions for framing. As an example, where will the north wall of the new bedroom 2 be constructed? 3. Provide hardwired, interconnected smoke alarms with battery back up for all sleeping rooms and the areas outside and in the immediate vicinity of the sleeping areas. Ref. R317. STRUCTURAL COMMENTS Sheet 5 1. Specify joists. If these are Truss Joist Macmillan TJI's, specify the series number to verify joist adequacy. PLUMBING COMMENTS Sheet 7 1. Provide venting for water heater in accordance with UPC 512. 2. Show complete drain, waste and vent provisions for shower and laundry. Ref. UPC Ch. 7. MECHANICAL COMMENTS General 1. Demonstrate provisions for maintaining a temperature of 68 degrees at 3 feet above the finished floor elevation. Ref. R303.6. ELECTRICAL COMMENTS Sheet 3 1. Please verify the adequacy of the existing electrical service. Show the existing service size and load. Provide the panel schedule, new load calculation and indicate the circuits to be used. 2. Receptacles must be located on the scaled drawings to be provided in such a manner that compliance for outlet spacing may be determined. Ref. E 3801.2. ENERGY COMMENTS Sheet 4 1. Please note R-values for batt insulation. |
06/30/2003 | EROSE1 | NPPO | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/30/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |