Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T03CM01190
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/22/2003 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 05/15/2003 | TERRY STEVENS | BUILDING-RESIDENTIAL | REVIEW | Denied | PLAN CHECK COMMENTS - PROJECT #T03CM01190 05/16/03 PLAN REVIEW FOR THE ABOVE REFERENCED STRUCTURE HAS BEEN COMPLETED. THIS LETTER REFLECTS COMMENTS TO BE ADDRESSED. IN ORDER TO FACILITATE A SHORTER BACK CHECK TIME, WE REQUEST THAT YOU PLEASE PROVIDE REVISED PLANS AND CALCULATIONS, HIGHLIGHTING ANY CHANGES, ALONG WITH A WRITTEN RESPONSE TO EACH OF THE NOTED ITEMS INDICATING ACTION TAKEN. GENERAL REQUIREMENTS: 1. ALL CORRECTIONS AND REVISIONS SHALL BE MADE ON THE ORIGINAL TRACINGS AND TWO NEW SETS OF PRINTS OR (1) SEPIA & (1) BLUE LINE SHALL BE RETURNED ALONG WITH ALL REDLINE PRINTS. 2. PEN OR PENCIL CORRECTIONS ON FINAL PRINTS WILL NOT BE ACCEPTABLE. TO AVOID DELAYS ENSURE ALL CORRECTIONS HAVE BEEN MADE, ARE COMPLETE AND HAVE BEEN COORDINATED ON ALL APPLICABLE DETAILS AND NOTES. FLOOR PLANS: 1. INDICATE LOCATION OF WASHER/DRYER 2. IDENTIFY CEILING HEIGHTS IN ALL AREAS ON FLOOR PLAN. IF SLOPED CEILING, NOTE AVERAGE HEIGHT. STRUCTURAL PLANS: 1. INDICATE CLEARLY ON PLAN WHAT THE ROOF IS BEING FRAMED WITH. 2. COMPLETELY DETAIL ALL CONNECTIONS AND CROSS-REFERENCE TO THE FOUNDATION AND FRAMING PLANS: - HIP TRUSSES TO GIRDER TRUSS - JACK TRUSSES TO HIP TRUSS - HANGER TYPES 3. NOTE AND DETAIL TIE STRAPS FRAMING ANCHORS AND JOIST HANGERS BY TYPE, SIZE AND REQUIRED ATTACHMENT TO FRAMING MEMBERS. ELEVATIONS: 1. SHOW CALCULATION OF ATTIC VENTILATION AREA IN COMPLIANCE WITH R806.2. NOTE LOCATION OF ALL VENTS NEEDED TO COMPLY.------IF ALL VENTING IS COMING FROM BIRD BOARDS THEN CALCS. ARE WRONG, THE SQUARE FOOTAGE IS DIVIDED BY 150 NOT 300 SECTIONS - DETAILS - MISC. NOTES: 1. NOTE AND SPECIFY THE LENGTH OF ANCHOR BOLTS FOR TOP PLATES. 2. CROSS-SECTIONS SHALL BE CROSS-REFERENCED TO THE FLOOR PLAN AND FRAMING PLANS. PLUMBING PLANS: 1. PROVIDE A PLAN VIEW DRAWING OF WASTE LINES. CALLOUT SIZES OF WASTE LINES, VENTS AND REQUIRED CLEANOUTS. 2. GAS: PROVIDE THE LENGTH OF LINE TO EACH APPLIANCE, BTU DEMAND OF EACH APPLIANCE, SIZE OF EACH BRANCH, TOTAL DEMAND & TOTAL DEVELOPED LENGTH FROM METER TO MOST REMOTE APPLIANCE ON THE SYSTEM PER UPC 1217.2 3. WATER LINE: PROVIDE TOTAL FIXTURE DEMAND & MAXIMUM DEVELOPED LENGTH 4. PROVIDE PRESSURE AND TEMPERATURE RELIEF VALVE AT WATER HEATER. 5. INDICATE TYPE OF WATER HEATER ENCLOSURE. MECHANICAL PLANS: 1. NOTE ON PLANS: MECHANICAL SHALL COMPLY WITH CHAPTERS 12 -16 AND18- 24 2000 IRC. 2. THE DWELLING MUST BE PROVIDED WITH HEATING CAPABLE OF MAINTAINING A ROOM TEMPERATURE OF 68 DEGREES AT A POINT 3' ABOVE THE FLOOR PER R303.6. IS FURNACE GAS OR ELECTRIC? ELECTRICAL PLANS: 1. INDICATE BATHROOM/LAUNDRY FIXTURES AND COUNTER TOPS 2. NOTE THE LOCATION, TYPE AND AMPERAGE OF THE PANEL. 3. PROVIDE AN EXTERIOR OUTLET AT GRADE LEVEL LOCATED AT BOTH THE FRONT AND BACK OF THE DWELLING, PER E3801.7. THESE OUTLETS SHALL BE GFI PROTECTED PER E3802.3. 4. PROVIDE ELECTRICAL LOAD CALCULATIONS 5. ELECTRICAL MISSING FOR FURNACE------120/240?-----DEPENDING WHETHER GAS OR ELECTIC 6. NOTE THAT ALL SMOKE DETECTORS MUST BE INTERCONNECTED WITH A POWER SOURCE FROM THE BUILDING WIRING, AND SHALL BE EQUIPPED WITH BATTERY BACKUP. MODEL ENERGY CODE: 1. PROVIDE ENERGY CALCULATIONS PER THE 1998 IECC, OR COMPLY WITH IRC CHAPTER 11. 2. CALL OUT ON THE PLANS THE "R" VALUES OF INSULATION, AS WELL AS THE "U" VALUES OF THE WINDOWS AND DOORS IN CONFORMANCE WITH THE ENERGY CALCULATIONS PROVIDED. IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT YOUR ASSIGNED PLANS EXAMINER: TERRY STEVENS @ 791-5550 EXT. 112 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/19/2003 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 05/16/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |