Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/11/2003 EROSE1 FIRE REVIEW Needs Review
03/11/2003 EROSE1 WATER REVIEW Needs Review
03/11/2003 WILDAN 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied GENERAL COMMENTS:
1. This project has been reviewed for conformance with the 2000 IBC, 1997 UAC, 2000 IMC, 1998 IECC, and 1999 NEC codes with local modifications, and the 1994 UPC with State of Arizona amendments. Any revisions to this plan will require an additional review and approval by Willdan.

2. Sheet M3 is missing from the plans. Please include to facilitate completion of the back-check. Reference IBC Section 106.1.1.

3. The elevator shall require permit and inspection from the State Elevator Inspector.

ARCHITECTURAL COMMENTS:
Sheet A4.1

1. The toilet rooms are accessible to the "public," as defined in the 1994 UPC, and therefore, require a wainscot to 48" above the floor with a minimum 6" base of non-absorbent material in accordance with 2000 IBC Sections 1209.1 and 1209.2.
Sheet A6

1. The overflow drain on the collector box for the roof drainage is not dimensioned to be maximum 2" above the roof low point as required by 1994 UPC, Appendix D.

Sheet DW1
1. Provide a legend/description for the hardware sets.

2. Reference the "Door Hardware" note regarding the gates. Clarify if all of the guest room locks and gates are keyed alike. Since the gates block egress system for occupants trying to exit the building, they shall be openable without use of a key or special knowledge or effort, per IBC Sections 1003.3.1.8 and 1003.3.2.

STRUCTURAL COMMENTS:
Sheet S0.1

1. Provide a completed "Special Inspection" form from the City Development Services Department that describes all required special inspections, what firm or agency shall be responsible for each type of inspection, and who the certified/qualified special inspector will be for the respective inspections. This is a requirement of COT/DSD before the plans can be approved and returned to the City for permit issuance. Reference IBC Section 106.1.1.

Sheet S1.2
1. Clarify the Beam Schedule for Beam B3. The engineer's calculations call for a "RS" rough-sawn 6x12 wood beam. Please coordinate. Revise plans as necessary. Reference IBC Section 106.1.1.

Sheet S2.1
1. The structural calcs call for an HD3 holdown on the first floor wall at line 63. Please coordinate and resolve. Revise plans as necessary. Reference IBC Section 106.1.1.

2. The structural calcs call for HD3 at wall line 59. Please coordinate and resolve. Revise plans as necessary. Reference IBC Section 106.1.1.

3. The structural calcs call for SW2 on both sides of the wall at line 27. Please coordinate and resolve. Revise plans as necessary. Reference IBC Section 106.1.1.
Sheet S2.2
1. The structural calcs on page 24 and page 26 call for shear wall SW1 at the east wall on the second floor at line 13 and a holdown HD1. Please coordinate and resolve. Revise plans as necessary. Reference IBC Section 106.1.1.

2. The structural calcs on page 9 call for a joist J4 with (115/100) loading at the exit balcony and adjacent to the exercise room. Please coordinate and correct. Revise plans as necessary. Reference IBC Section 106.1.1.

Sheet S2.3
1. Framing Key Note 41 symbol is shown at the southwest corner of the north wing. Key Note 41 is not included in the legend. Please coordinate and resolve. Revise plans as necessary. Reference IBC Section 106.1.1.

PLUMBING COMMENTS:
Sheet P1

1. Coordinate the cold water pipe size at the northwest portion of the plan. Two places indicate ¾", while a later note shows 1" cw, and riser diagram 6/P3 shows 1" cw up. Revise plans as necessary. Reference IBC Section 106.1.1.

Sheet P4
1. The fixture unit schedule is missing the water demand F.U.'s for the 3 clothes washers in the Laundry Room. Please correct. Revise plans as necessary. Reference IBC Section 106.1.1.

2. Both columns on the schedule are labeled waste. Please correct to show both waste and water demand. Reference IBC Section 106.1.1.

3. The demand for the hose bib is missing from the F.U. schedule. Please revise to include. Reference IBC Section 106.1.1.

MECHANICAL COMMENTS:
1. Sheet M3 was not included with this submittal. Reference UBC Section 106.1.1.

2. Clarify how the evaporative coolers bleed lines comply with the water conservation ordinance of the City. Reference IBC Section 106.1.1.

ELECTRICAL COMMENTS:
Sheet E-1

1. The electrical systems shall comply with the 1999 NEC, per Dave Mann, P. E., City Building Official. The IRC only applies to single family and duplex dwellings. This building is neither, although it contains 3 overflow guest rooms for the condo owner's guests. Please revise the electrical plans accordingly. Reference IBC Section 106.1.1.

2. The 400 amp. Panel Schedule shows an "Oven" on circuits 1 and 3; however, the oven is not shown on the plans. Please coordinate and clarify. Reference IBC Section 106.1.1.

3. All exterior light fixtures shall be listed for use in wet or damp locations in accordance with NEC Section 410.4(a) and Article 100 for the definition of "location." This includes all light fixtures outside of an enclosed building. Revise plans as necessary. Reference NEC Section 410.4.

4. All exterior light fixtures shall be fully shielded in accordance with the Tucson/Pima County Outdoor Lighting Code. Reference IBC Section 106.1.1.
5. Correct the Riser Diagram to the 1999 NEC. NEC Table 250-66 requires the service grounding electrode conductor to be sized for the 400-ampere service conductor. A #4 cu is undersized for the electrode grounding conductor, except for the UFER ground conductor encased in concrete footing. Revise plans as necessary. Reference IBC Section 106.1.1.

Sheet E2
1. Coordinate this sheet with Sheet P2 for the location of the water closet and lavatory in the common guest bathroom. The GFI receptacle shall be adjacent to the lavatory, not the water closet, per NEC Section 210. Reference IBC Section 106.1.1.

2. Please coordinate the location and labeling of the panels on both floors. Reference IBC Section 106.1.1.


ENERGY CODE COMMENTS:
1. The energy code calculations and drawings for the building envelope have been reviewed and accepted.

2. Provide data to verify the mechanical HVAC systems and lighting (both interior and exterior) comply with 1998 IECC.

ACCESSIBILITY COMMENTS:
1. The plans have been reviewed and accepted for accessibility.
03/11/2003 EROSE1 FLOODPLAIN REVIEW Needs Review
03/11/2003 ELAINE ROSE ZONING REVIEW Needs Review
03/11/2003 EROSE1 WWM REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
03/11/2003 ELAINE ROSE OUT TO CUSTOMER Completed