Permit Number: T03CM01117
Parcel: 10712215B

Address:
21 W LAGUNA ST

Review Status: Completed

Review Details: RESUBMITTAL - SITE

Permit Number - T03CM01117
Review Name: RESUBMITTAL - SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/16/2003 PATRICIA GILBERT ENGINEERING REVIEW Denied DATE: May 15, 2003
ACTIVITY NUMBER: T03CM01117
PROJECT NAME: House of Fine Cars
PROJECT ADDRESS: 21 W. Laguna Street
PROJECT REVIEWER: Patricia Gilbert

The following items must be revised or added to the site plan. Please include a response letter with the next submittal that states how all comments have been addressed.

RESUBMITTAL REQUIRED: SITE PLAN

SUBMITTAL REQUIRED: DRAINAGE STATEMENT


1. The proposed sight visibility triangles on the site plan are backwards, revise plan accordingly.

2. For the proposed solid waste condition and location, provide written approval from John Clark of the Solid Waste Department, 791-5543 extension 1126.

3. Add a general note to the site plan stating that, all roof down spouts on all structures must be routed under any adjacent sidewalks and sidewalks must be flood free for up to the 10yr. event." DS 2-08.4.1.E

4. Please include in your third submittal a drainage statement addressing how the current flow through condition will continue to allow floodwaters to be accepted and released from the 30" CMU wall located on the north side of the property. Additionally the proposed sidewalk must be flood free for up to the 10-yr. event. A drainage structure (scupper) must be provided to route stormwater under the sidewalk. Show this structure on the plan (with appropriate sizing). DS 2-08.4.1.E. For the criteria of a Drainage Report refer to the Standards Manual for Drainage Design and Floodplain Management, SMDDRM, 2.1.
05/20/2003 JIM EGAN FIRE REVIEW Approved
05/29/2003 JOE LINVILLE LANDSCAPE REVIEW Approved
05/29/2003 JOE LINVILLE NPPO REVIEW Approved
06/02/2003 DAVID RIVERA HANDICAP-SITE REVIEW Approved
06/02/2003 DAVID RIVERA ZONING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
06/03/2003 CINDY AGUILAR OUT TO CUSTOMER Completed