Permit Number: T03CM01110
Parcel: 10511061R

Review Status: Completed

Review Details: 3RD PARTY REVIEW-COMMERCIAL TI

Permit Number - T03CM01110
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/11/2003 STANTEC 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied ARCHITECTURAL:
Indicate the Type of Construction as II-B. Indicate the occupancy group as M.

Equipment List: Clarify the quantity of items 31 and 33. The list indicates 2 each, but the plans only indicate one each. Revise plans to correct conflicts.

The existing floor sinks under the new front counter/cabinetry shall be located in compliance with UPC Section 804.1, i.e.; they shall be readily accessible for service and cleaning and shall not be with a cabinet. Plans are not sufficiently detailed to verify compliance.



MECHANICAL:

The hood above the new appliances is not detailed sufficiently to verify the projects 6" minimum beyond the front of the cooking surface of the appliances. Also clarify that the bottom edge of the hood is not more than 4' above the cooking surfaces. See IMC 507.12. If the hood requires alteration, provide complete design in compliance with the IMC requirements.

PLUMBING:

Provide gas piping schematic detailing pipe sizes, developed lengths, gas loads of existing and proposed sufficient to verify existing system and proposed will be in compliance with UPC requirements.

ELECTRICAL:

The electrical portion is not sufficiently detailed to verify new loads do not exceed capacity of the existing electrical system. Are any of the existing loads being deleted? Provide panel schedule(s) indicating circuit requirements and loads.
03/11/2003 EROSE1 WATER REVIEW Needs Review
03/11/2003 EROSE1 WWM REVIEW Needs Review
03/11/2003 EROSE1 NPPO REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
03/11/2003 ELAINE ROSE OUT TO CUSTOMER Completed