Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T03CM01031
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/05/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
03/06/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
03/06/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
03/11/2003 | GERRY KOZIOL | WWM | REVIEW | Approved | |
03/19/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
04/07/2003 | DAVE MANN | BUILDING-COMMERCIAL | REVIEW | Approv-Cond | Clarify if outdoor areas are part of permit. |
04/11/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. Sheets E0.2 & E6.1, Line Diagrams 1. On Sheet E0.2 Panel FCL is ETR, and powering new Panel FCR. On Sheet E6.1, Panel FCL is shown as new, as are its feeder and fused disconnect. Please clarify. 2. Also note that Panel FCL is ETR on Sheet E2.3, but shown as new on E2.1 and E6.1. Please clarify. 3. Provide load calculation for MSB-4. Sheets E0.1 & E0.2, Panel Schedules 1. Panel Schedule for new Panel FCL is on both of the above sheets. On Sheet E2.1 the transformer load has not been included. Please clarify. 2. Panel Schedule FCL does not include the 125/3 circuits to the Dimming Panel. Please include. 3. Please provide corrected load calculations for Panel FCL. 4. Interrupting capacity for Panel FCR is undefined. Please define. Sheet E2.3, Fountain 1. Provide specifications for Fountain Control Panel and Fountain Pump Motors. 2. Provide overload protection, disconnect, ground fault & short circuit protection for motors. 3. Demonstrate that electrical equipment that depends on submersion for safe operation is protected against overheating per NEC 680-51 (d). 4. Provide Ground Fault Circuit Interrupter per NEC 680-51 (a). 5. Provide fixture cut sheets for fountain lights. Demonstrate that the voltage of such fixtures does not exceed 150V, per NEC 680-50 (b). 6. Specify installation per NEC 680-51 (c), (e), (f), & (g). 7. Specify material and workmanship for Junction Box per NEC 680-52 (b). 8. Specify grounding and bonding per NEC 680-53, 680-54, and 680-55. Call for an isolated ground from fountain equipment to the panelboard supplying such equipment. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/23/2003 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |