Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL
Permit Number - T03CM00975
Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/10/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
| 11/10/2003 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | SCOPE OF REVIEW: The scope of this review covers Architectural, Structural, Plumbing, Mechanical and Electrical. All features were checked only to the extent allowed by the submittal provided. All portions of the project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL: q Provide site plan information. The following information needs to be presented at a bare minimum: · Distance from the building to the property line and other structures on the property. · The building's finished floor elevation and how this relates to the adjacent grades. · Sewer information (pipe sizes, flow direction, cleanouts, rim elevation of manholes, etc.). · Water service (water meters, backflow prevention, etc.) ARCHITECTURAL: q There are no architectural comments to be addressed. STRUCTURAL: q The special inspection certificates that have been provided need to have a signature from the owner or his/her legal representative. q Page 44 of the structural calculations indicates that the plywood roof diaphragm is to be nailed at 6" o.c. The Roofing Plan Keyed Note 1 on Sheet S3.1 indicates to see the general structural notes for attachment of the roof diaphragm. The general structural notes on Sheet S1.1 indicate the nailing of the roof diaphragm is to be 12" o.c. Please clarify. MECHANICAL: q There are no mechanical comments to be addressed. PLUMBING: q There are no plumbing comments to be addressed. ELECTRICAL: q There are no electrical comments to be addressed. -End of Review- |
| 11/10/2003 | EROSE1 | WATER | REVIEW | Needs Review | |
| 11/10/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/10/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |