| 04/04/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Modify water and waste fixture units in the fixture schedule to conform to the values shown in Sections 610.7 and 703.1, UPC 1994. 2. Coordinate fixture schedule with the plans. 3. Coordinate the waste and vent schematics with the plans and finish sizing the pipes. 4. Arrange water supply piping to conform to Section 601.2, UPC 1994. 5. Correct the water calculations to show a minimum pressure of 15 PSI at the farthest fixture (Section 608.1, UPC) and deduct the pressure drop through only one of the meters (the meters are arranged in parallel). 6. Correct the insulation note in the plumbing specification (Section 2.07); it has symbols substituted for the thickness of the insulation. |
| 04/04/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The Ventilation calculations indicate a total of 375 CFM required for the space. The balancing note calls for only 360 CFM of outside air for the space. The heat pump unit schedule calls for only 150 CFM of outside air for the two heat pumps. Coordinate the balancing note and the heat pump schedule with the calculations. Balance the outside air quantities to each heat pump to ensure that the correct amount of outside air is supplied to each room as shown in the ventilation calculations. Reference Section 403, IMC 2000. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/30/2003 | LISA LESNY | OUT TO CUSTOMER | Completed |