Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T03CM00689
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/10/2003 | JAMES TATE | FLOODPLAIN | REVIEW | Approved | FUP No. T03OT00201 |
02/24/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
02/28/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1. Size MBJ per NEC 250-28 (d). 4/0 Service Entrance Conductors require #2 MBJ, not #4. 2. Size Grounding Electrode conductor to metal water pipe per NEC 250-66. 4/0 Service Entrance Conductors require #2, not #4. 3. Note #12 regarding the removal of ground jumper between the PPS neutral and the PPC ground bus bar. Define PPS. Define PPC. Note by legend refers to Sheet A-5 for definitions. No such definitions on Sheet A-5. 4. Service entrance appears to be in a different location from the meter main on E-3. On E-1 the Meter Main cabinet IS the location of the point of service. |
02/28/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1. Size MBJ per NEC 250-28 (d). 4/0 Service Entrance Conductors require #2 MBJ, not #4. 2. Size Grounding Electrode conductor to metal water pipe per NEC 250-66. 4/0 Service Entrance Conductors require #2, not #4. 3. Note #12 regarding the removal of ground jumper between the PPS neutral and the PPC ground bus bar. Define PPS. Define PPC. Note by legend refers to Sheet A-5 for definitions. No such definitions on Sheet A-5. 4. Service entrance appears to be in a different location from the meter main on E-3. On E-1 the Meter Main cabinet IS the location of the point of service. |
03/12/2003 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | City of Tucson, Development Services BUILDING AND STRUCTURAL COMMENTS 1) Provide monopole footing detail 2) Provide structural calc1`s and details of masonary wall. Show wall and reinforcement details on plans. |
03/24/2003 | JAY HOGAN | OPERATIONS | REVIEW | Passed | |
03/27/2003 | GLENN MOYER | PLANNING-CITY HALL | REVIEW | Approved | 3-27-03 Sheet A-7 Antenna mount plan view shows antennas extending more than one (1) foot and no room has been allowed for downtilt. Drawing must compy with the Zoning Examiner's decision is Special Exception case SE-02-22 condition #3. To ensure compliance show antenna at full downtilt on drawing. Glenn Moyer 791-4541x1167 |
03/27/2003 | GLENN MOYER | PLANNING-CITY HALL | REVIEW | Approved | Per revised Sheet A-7 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/31/2003 | DELMA ROBEY | OUT TO CUSTOMER | Completed |