Permit Number: T03CM00662
Parcel: 12510006A

Review Status: Completed

Review Details: REVISION

Permit Number - T03CM00662
Review Name: REVISION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/12/2004 DOUG LAAKSO BUILDING-COMMERCIAL REVIEW Approv-Cond
01/12/2004 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US
IF YOU CARE TO DISCUSS.

GLOBAL
PLEASE NOTE THAT ALTHOUGH OTHER DISCIPLINES RECEIVED A RESPONSE LETTER TO THE PREVIOUS COMMENTS, ELECTRICAL DID NOT. THIS COULD HAVE FACILITATED/STILL COULD FACILITATE REVIEW. AND IT IS A REQUIREMENT.

Sheet E1
1. New RTU-20 at 7.5 KVA, would be 9.2 amps at 480V. 60 A CB too high to provide ground fault and short circuit protection. This comment was made on 11/11/03.
2. AFC Rating at Panels 10A, 10B, 11and 12 exceed fault current shown on plans. This comment was made on 11/11/03.
3. Regarding the 45A CB protecting RTU-3, it is too large to provide Ground Fault and Short Circuit protection per NEC 440-22 (a). Please re-evaluate this, and all other such units on this project, not just on this submittal. This comment was made on 11/11/03. RTU-3 now has a 60A CB.
4. RTU-5, with only 1.4 BHP, should be protected by a 15A CB.
5. Fault calculations indicate that 12,388 A at HP-1, but 17,373 A at HP-1, in different parts of this Sheet. Please clarify. Same as with ATS. This comment was made on 11/11/03.
6. The secondary of Transformer T-2 does not appear to meet the requirements of NEC 240-21 c (3). Conductors terminate in a 800A OC device and their ampacity for copper is only 760. Note that there are not provisions in this Article for rounding up.
7. The secondary of Transformer T-1 does not appear to meet the requirements of NEC 240-21 c (2). Conductors terminate in a 400A OC device and their ampacity for copper is only 380. Note that there are not provisions in this Article for rounding up.

Sheet E4
1. Keynote 18 refers to Panel LP-5A. There is no such Panel Schedule. This comment was made on 11/11/03.

Sheet E4B
1. Revision 4 is not documented in sidebar. Please do so.

Sheet E7
1. HLE3-42 has Q3 fixtures. No such fixture on Light Fixture Schedule. This comment was made on 11/11/03.
2. HLE3-42 has W3 fixtures. No such fixture on Light Fixture Schedule. This comment was made on 11/11/03.
3. LP10B-15 has X5 fixtures. No such fixture on Light Fixture Schedule. This comment was made on 11/11/03.
4. LP10B-15 has X6 fixtures. No such fixture on Light Fixture Schedule. This comment was made on 11/11/03.
5. LP10B-19 has X4 fixtures. No such fixture on Light Fixture Schedule. This comment was made on 11/11/03.

E7A
1. Fixture A9 is in Room 111A. Fixture was omitted from Light Fixture Schedule.
2. Revision 4 is not documented in sidebar. Please do so.

E8A
1. Provide disconnect for EWH-2 per NEC Article 422 Part C.
2. TF-1 on this sheet, but not on any equipment schedule.
3. General Notes on present version as submitted do not appear on approved version, which was sealed by the Registrant 5/13/03, revised (Revision 1) 5/14/03, and approved for Electrical 7/25/03. And not included in Revision triangle.
4. Key Notes on present version as submitted do not correspond to Key Notes on approved version, which was sealed by the Registrant 5/13/03, revised (Revision 1) 5/14/03, and approved for Electrical 7/25/03. And not included in Revision triangle.
5. Revision 4 is not documented in sidebar. Please do so.

E8B
1. Revision 4 is not documented in sidebar. Please do so.

E10, E10A, E10B
1. HL-1 has 24,980 AFC per Sheet E1. Rated at 18,000. Please clarify on this and each panel in this project.
2. Do not accept the concept that we are to consider the entire sheets revised. Use Revision clouds so that we don't have to re-review the entire project. For example, most of the branch circuits on HL-1 have been modified. We are not in a position to totally re-review the entire project down to the branch circuit level. Consider this comment to be typical for all panels.
3. HP-1 appears to be overloaded at 965A. Provide load calculations for LD-1, LD-2, HP-1, MDP-1, MDP-2, and MDS, the cumulative total for this project. Show in detail where your diversity factors are applied.
4. On the revised drawings, HL-1 is powered by MDP. On the original submittal, and on Sheet E1, HL-1 is powered by MDP-1. Furthermore, there is no equipment MDP on the Line Diagram Sheet E1. EWH-5 and EWH-6 are on LP-9, but not on equipment schedule. Please clarify.
5. Panel LPE-1, Phase A is overloaded at 103.3 A. Please correct.
6. Panel LP4, Phases A and B are overloaded at 114.2A and 106.7 A. Please correct.
7. Panel LP10B, Phase B is overloaded at 128.3 A. Please correct.

E11
1. Add PRV-6, CU-1A, and CU-1B to your Revision Cloud. They were not on the drawings approved 7/25/03.

CC1
1. Revision 4 is not documented in sidebar. Please do so.

FA3, FA4, FA5
1. Revision One is indicated in the sidebar but not on the plans. Please clarify.

BA2, BA3, BA4
1. Identify Revision One on the plans.
12/31/2003 Robert Sherry MECHANICAL-COMMERCIAL REVIEW Denied The Refrigeration Schedule (1/M13) indicates a charge of 530 pounds of R-404a in the largest system, not 400 pounds. Revise the emergency exhaust for the compressor room (165) to comply with Section 1105.6.4, IMC 2000.
12/31/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide an accessible cleanout in the vent for the combination waste and vent system located near D-9. Reference Section 910.6, UPC.
2. Resize the vent for the combination waste and vent system to comply with Section 910.3, UPC 1994. The cross-sectional area of a 2" vent is roughly 25% of the area of a 4" drain, not 50% as required.
3. Resize the drain lines from the four floor sinks (FD-3, 4") located along column line 10 between Columns C and E to comply with Section 311.5, UPC 1994.
4. Revise Detail 2/M9 to show 2 compartments of the 3-compartment sink being directly connected to the grease trap and one compartment indirectly connected to a floor sink. The flow control fitting should stay with the two compartments being directly wasted. Reference Section 1011.3, UPC 1994.
5. Update the Food Service Connection Schedule (M5) to reflect the revised connections for the 3-compartment sink.
6. Provide a vent for the grease trap. Reference Section 901.0, UPC 1994.
7. Indicate the type of backflow prevention device to be used for the individual pieces of food service equipment and for the cleaning solution dispenser on the drawing. Reference Section 103.2.3, UPC 1994.
8. Show plumbing fixture F-8 on waste and vent riser diagram, Detail 2/M9; it also requires a vent. Reference Sections 103.2.3 and 901.0, UPC 1994.
9. Has RTU-23 (5/M9) been renumbered as RTU-20? Reference Section 103.2.3, UPC 1994.
10. Correct the number of the circulating pump is being installed on WH-6 (Detail 3/M9) from CP-1 to CP-2 to agree with sheet M12. Reference Section 103.2.3, UPC 1994.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/14/2004 LISA LESNY OUT TO CUSTOMER Completed
01/14/2004 ANGIE SHOFFSTALL REJECT SHELF Completed