| 09/18/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 10/10/2003 | DOUG WILLIAMS | SANITATION | REVIEW | Denied | See comment #3 under Engineering folder. |
| 10/10/2003 | Doug Williams | ENGINEERING | REVIEW | Denied | SUBJECT: 600 West 25th Street REVIEWER: Doug Williams DATE: 10 October 2003 ACTIVITY NUMBER: T03CM00607 T14S, R13E, Section 23 SUMMARY: Engineering Division has reviewed the site plan and drainage report received on October 10, 2003. Approval of the site plan is not recommended at this time. The following comments are offered: 1. Dimension the driveway width at the Interstate 10 Frontage Road, and identify the type of material (concrete, asphalt, etc.) existing at this location, and label both adjacent street names, in accordance with Development Standards (DS) 2-02.2.1.11 & 18; 2. Dimension Frontage Road and 25th Street rights of way (DS 2-02.2.1.19); 3. Identify the existing (or proposed) refuse container location, size, and access thereto, fully labeled and dimensioned (DS 2-02.2.1.32 and DS 6-01.0); If you have any questions, I can be reached at 791-5550, extension 1189 or Dwillia1@ci.tucson.az.us. Douglas Williams Sr. Engineering Associate Engineering Division Development Services Department |
| 10/18/2003 | Peter McLaughlin | ZONING | REVIEW | Denied | TO: Al Gastelum 5085 N. Valley View Road Tucson, AZ 85718 (520) 290-2202 FROM: Peter McLaughlin Senior Planner FOR: Patricia Gehlen Principal Planner Development Services Dept. PROJECT: T02CM03799 New Storage Building for Atko Building Products 600 W. 25th Street Site Plan Review (1st review) TRANSMITTAL: October 20, 2003 COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. This project is being reviewed as less than a 25% expansion. DS 2-02 2. State the existing and proposed use on the site plan. Parking and other calculations may not be verified until the use is clarified. DS 2-02.2.1.A.31 3. Add the development designator to the general notes. If there are any LUC restrictions which the use is subject to please add a note detailing these restrictions. 4. State on the plan whether the crosshatched metal canopy is existing or proposed. Label the "new building" as proposed. DS 2-02.2.1.A.2 5. Provide a Floor Area Ratio (FAR) calculation stating both maximum allowed FAR and the proposed FAR. FAR is calculated as gross floor area divided by site area. DS 2-02.2.2.A.2 6. Add building setback dimensions to property lines for the proposed new building. DS 2-02.2.1.A.7 7. Add a parking detail dimensioning the width and length of the parking spaces. Also, the wheelstops must be dimensioned on the drawing as being two-and-one-half (2½) feet from front of parking spaces. Also, add a vehicle parking calculation to the site plan notes, stating how many vehicles are required/provided. DS 2-02.2.1.A.8 DS 2-02.2.2.A.4 DS 3-05.2.3.C.2 8. Provide a handicap vehicle parking calculation stating how many h/c spaces are required/provided. Add a handicap parking detail indicating all dimensions and maximum slope of the access ramp and aisle to be provided. A van accessible h/c parking space with an adjacent eight-foot access aisle is required. Please revise drawing. DS 2-02.2.2.A.4 IBC ANS 9. Show the location of existing/proposed bicycle parking spaces on the site plan, fully dimensioned per DS 2-09. Add bicycle parking calcs (number and type required and provided) to the site plan notes. DS 2-02.2.1.A.9 DS 2-02.2.2.A.4 10. A loading zone is required for the new building. Show the location of the loading zone fully dimensioned on the plan drawing. Add loading calcs stating that one loading zone is required /provided. DS 2-02.2.1.A.8 DS 2-02.2.2.A.5 11. Add the height of the proposed building on the site plan. DS 2-02.2.1.A.6 12. Label as to its purpose the square box surrounding the metal canopy. DS 2-02.2.1.A.6 13. Continuous pedestrian circulation is required to connect between the proposed building and existing buildings and to the right-of-way along 25th Street. Please revise drawing to show pedestrian circulation, with widths dimensioned. DS 2-08 DS 2-02.2.1.A.12 14. A 5-foot pedestrian refuge with a 4-foot concrete sidewalk is required between the building and vehicle use areas. A minimum 4-foot sidewalk is required between the proposed new building and the six new parking spaces proposed along the south side of the new building. DS 3-05.2.2.B.1 DS 2-08 DS 2-02.2.1.A.12 15. Show the location, dimensions and purpose of any existing easements on the drawing and provide recordation information (docket and page). DS 2-02.2.1.A.20 16. Label 25th street and I-10 on the site plan DS 2-02.2.1.A.18 17. Dimension the width of the access drive 25th Street. DS 2-02.2.1.A.11 18. Add the site zoning and adjacent zoning to the plan drawing. DS 2-02.2.1.A.28 19. If any new free-standing outdoor lighting or signage is proposed for this site, please label/detail on the site plan. Also, indicate if any billboards exist on the site. DS 2-02.2.1.A.13 & 25 20. A landscape plan, with information specified in DS 2-07 must also be submitted. DS 2-02.2.1.C If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. PSMc: H:\MYDOCS\PETER\SITEPLANS03\T03CM00607a.doc |
| 10/20/2003 | PETER MCLAUGHLIN | HANDICAP-SITE | REVIEW | Denied | See zoning review comments. |
| 10/22/2003 | Joseph Linville | LANDSCAPE | REVIEW | Passed | |
| 10/22/2003 | JOE LINVILLE | NPPO | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/24/2003 | LISA LESNY | OUT TO CUSTOMER | Completed |