Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T03CM00475
Parcel: 13612004K

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T03CM00475
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/10/2003 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
06/10/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Provide roof drainage plans. Reference Appendix D, UPC. Second request.
06/24/2003 MARTIN HAEBERLE BUILDING-COMMERCIAL REVIEW Denied Please provide written response to comments in order to expedite review.

1. Allowable area calculations utilizing an automatic sprinkler system for area increases is not allowed when also being used to exempt one-hour construction per Table 601 IBC. Show compliance with Table 601-footnote d by providing one-hour construction or revising allowable area calculations. note: please reference entire structure.
2. Provide a plumbing fixture count that includes the additional occupant load in compliance with Table 2902.1 IBC
3. Approval for deferred submittal of Steel Joists requires approval of the Building Official. Submit request for approval to the Building Official including the estimated date of submittal
4. Address slope protection of building from ascending slopes as required by section 1805.3.1 IBC. Note: is not being addressed on civil drawings submitted.
5. Column foundations are on the edge of a drainage swell. Address protection of lateral support of footings. Reference section 1803.1 IBC
6. An accessible route including toilet facilities to primary function to be shown. Note: include signage Reference section 3408.6 IBC
7. Weep screed on exterior plaster is required per section 2512.1.2 IBC. Revise details. See sheet A-15
07/01/2003 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Approved
07/03/2003 PETER MCLAUGHLIN ZONING REVIEW Denied Building Plans will be approved after site plan approval.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/08/2003 LISA LESNY OUT TO CUSTOMER Completed
07/08/2003 ANGIE SHOFFSTALL REJECT SHELF Completed