Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T03CM00475
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/20/2003 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Site plan approval required. See site review comments. |
03/20/2003 | GERRY KOZIOL | WWM | REVIEW | Passed | |
04/04/2003 | PAUL MACHADO | FLOODPLAIN | REVIEW | Approved | |
04/07/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide roof drainage plans. Reference Appendix D, UPC. |
04/07/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Indicate the location of the duct smoke detector on plans, Reference Section 606.2.1, IMC 2000. 2. All concealed spaces used for supply or return air cannot contain: a. Combustibles with a flame spread rating over 25 or smoke developed rating over 50. Reference Section 602.2.1, IMC 2000. b. Wiring or insulation not approved for this application. Reference Section 602.2.1.1, IMC 2000. 3. Provide information to show that the hydronic piping complies with the requirements of Chapter 12, IMC 2000. 4. Provide Model Energy Code calculations for the building addition. Reference Section 101.4.2.1, IECC, 1998. |
04/07/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
04/18/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1. Lighting fixtures C & D both explicitly call for 120V and 130V, respectively. All lighting is powered by L1, a 480/277 panel. Please clarify/submit lighting fixture cut sheets for all new lights on this project. 2. Please submit IECC calculations for internal lighting power budget. I believe this building was constructed after 1994. 3. FCU-1 and CU-1 are on the mechanical schedule and plans, but not on electrical. Please clarify. 4. Exterior fixtures are on L1-42. However, the panel schedule indicates this is a 3-P breaker powering the air handler. |
04/29/2003 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Allowable area calculations utilizing an automatic sprinkler system for area increases is not allowed when also being used to exempt one-hour construction per Table 601 IBC. Show compliance with Table 601-footnote d by providing one-hour construction or revising allowable area calculations. 2. Provide a plumbing fixture count that includes the additional occupant load in compliance with Table 2902.1 IBC 3. Approval for deferred submittal of Steel Joists requires approval of the Building Official. Submit request for approval to the Building Official including the estimated date of submittal. 4. The city does not do Level 1 special inspections. Revise general structural note. 5. Provide structural analysis for proposed wall shown on sheet A-0. 6. Address slope protection of building from ascending slopes as required by section 1805.3.1 IBC. Note: is not being addressed on civil drawings submitted. 7. Column foundations are on the edge of a drainage swell. Address protection of lateral support of footings. Reference section 1803.1 IBC 8. An accessible route including toilet facilities to primary function to be shown. Note: include signage Reference section 3408.6 IBC 9. Weep screed on exterior plaster is required per section 2512.1.2 IBC. Revise details |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/29/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |