Permit Number: T03CM00321
Parcel: 12212052A

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T03CM00321
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/12/2003 JIM TATE ENGINEERING REVIEW Denied A copy of the stamped approved Site Plan must be included in the submittal.
06/23/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Water pressure calculations indicate a pressure greater than 80 PSIG. Provide pressure regulator conforming to Section 608.2, UPC 1994.
2. Provide an upper terminal cleanout on the horizontal drainage pipe serving the clothes washer in the typical 2-bedroom plan. Reference Section 707.4, UPC.
3. Show location of the main drain drop from the second floor on the first floor of the typical 2-bedroom plan.
4. Site utility plan does not indicate the location and size of an RPBP assembly. If an RPBP is required by Tucson Water, show location and size.
5. Site utility plan and calculations indicate a ¾" meter is to be installed on a 1" water service line. The size of the meter must be the same as the size of the water service line. Reference Sections 610.2 and A 6.1, UPC 1994.
6. Termination of the excess pressure relief from the water heater over a service sink is not approved location. Reference Section 608.5, UPC 1994. Show routing of the excess pressure relief.
7. The provided roof drainage calculations appear to indicate that the 4x5 downspouts are to be used for both roof drains and overflows. Appendix Section D 1.1 (d), UPC 1994, requires that the overflow be independent of the roof drain. If a scupper is to be used to act as an overflow, provide calculations to show that it is adequately sized.
06/24/2003 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
06/27/2003 MARTIN HAEBERLE BUILDING-COMMERCIAL REVIEW Denied 1. Clarify type of sprinkler system to be used. If a NFPA 13 R system is used the exception for fire resistive reductions will not apply. Reference section 903.1.2.
Fire partitions between units to be continuous through floor/ceilings, including drop ceilings. References section 708.4 IBC. Provide detail.
07/08/2003 DAN CASTRO ZONING REVIEW Denied Sructural plans may not be approved until the site plan is approved by all sections.
07/10/2003 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
07/15/2003 CINDY AGUILAR OUT TO CUSTOMER Completed
07/10/2003 ANGIE SHOFFSTALL REJECT SHELF Completed