Permit Number: T03CM00316
Parcel: Unknown

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T03CM00316
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/03/2003 JIM EGAN FIRE REVIEW Approved
03/05/2003 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US
IF YOU CARE TO DISCUSS.

Sheet E2
1. MCC Section 2DF feeds a 2 HP Oven Make-Up. Keynote 4 calls for a 30A fuse. 3-Phase 480V motor draws 3.4 A. 30AF is not sufficient to serve as Short Circuit & Ground Fault Protection.
2. Show overload protection for the 2 HP Oven Make-Up above.
3. Coordinate MCC Section 2DF with same on New MCC Load One Line Diagram Sheet E8. Here it feeds AC-01, not Oven Make-Up. Here it is protected by a 50AF, not a 30AF.
4. If the depiction on Sheet E8 is correct in that 2DF supplies AC-01, note that a 50AF is not sufficient to protect #10 conductors.
5. MCC Section 4LM feeds a 5 HP Oven Make-Up. Keynote 6 calls for a 5A fuse. 3-Phase 480V motor draws 7.6 A. 5AF is not sufficient to allow this motor to start.
6. Coordinate MCC Section 4LM with same on New MCC Load One Line Diagram Sheet E8. Here it feeds EF-01, not Oven Make-Up #3. Here it is 4 HP, not 5 HP.

Sheet E4
1. Coordinate with Sheet E7 and CCK3. Label rooms consistently. This review assumes that the room designations on E7 and CCK3 are the correct ones.
2. Prep-Oven Bays, Rooms 103 and 114. It is understood from a conversation with Charles Riggs (3/5/03) that these are to be classified locations. This was not indicated on Sheet CCK3 of the Code analysis booklet, nor are there provisions for the work to be done in compliance with Code requirements for these areas, as classified. Please clarify whether indeed the activities in these rooms would render them candidates for classification, and if so what that classification shall be. Revise plans as necessary. Note that if aircraft are to be moved into this area for processing, they would have to be Unfueled according to the definition in NFPA 409 3.3.13 to avoid classification according to Article 513, Aircraft Hangers.
3. New prep-Bay, Room 110. Same as above regarding the question of classification, and the electrical work to be performed in this area.

Sheet E6
1. Load calculation on Panel DP-PBOT. 66.3 (2) = 132.6. 132.6 (1.25) = 165.8. Neither of these values corresponds to 144.7 KVA.
03/07/2003 GERRY KOZIOL WWM REVIEW Passed nO WASTEWATER PLUMBING FIXTURES ADDED
03/12/2003 ROBERT SHERRY WATER REVIEW Approved
03/12/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Indicate connection point of existing medium pressure natural gas pipe and new medium pressure natural gas pipe on plans.
2. Coordinate routing and sizes of natural gas piping to the make-up air units as shown on sheets M3, M4, and PBM-4.
3. According to the make-up air unit schedule on sheet PBM-4, each of the make-up air units requires 2,910 CFH of natural gas. What is the remaining 14,860 CFH to be used for?
4. Provide listing for natural gas regulators and gas valves for medium pressure service. Show arrangement of gas trains on the drawing. Reference Section 1218.4, UPC 1994 and Section 304.1, IMC 2000.
5. Indicate route and termination point of existing drain being used to drain OAU-1 and AC-01. Provide calculations to confirm that the existing drain line is adequately sized to handle the new and existing loads. Reference Section 307.2.2, IMC 2000.
6. Clarify reason for compressed air bypass at breathing air purifier.
03/12/2003 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Install trap on AC-01 per manufacturer's installation instructions. Reference Section 304.1, IMC 2000.
2. Provide sequence of operation showing conformance to Section 502.6.3.1, IMC 2000.
03/14/2003 MARTIN HAEBERLE BUILDING-COMMERCIAL REVIEW Approved
03/14/2003 PATRICIA GEHLEN ZONING REVIEW Passed
03/17/2003 DOUG WILLIAMS FLOODPLAIN REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
03/19/2003 TAMI ACHONG OUT TO CUSTOMER Completed
03/18/2003 ELAINE ROSE REJECT SHELF Completed