Permit Number: T03CM00302
Parcel: 11307086A

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T03CM00302
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/06/2003 JIM TUCKER FIRE REVIEW Approved
02/12/2003 DOUG LAAKSO BUILDING-COMMERCIAL REVIEW Denied .. T03CM00302 .. 3055 N CAMPBELL AVE .. DGL .. 2/12/03 .. 1. PERMITS ARE REQUIRED FOR WALKIN COOLER ADDITION, COOLING EQUIPMENT, AND CONCRETE PAD AT LINE '5' AND LINE 'A' ON DRAWINGS REF. A-090, A-100, A-110, A-120, A-130, A-220, S-101, M-100, M-300, M-400, E-110, E-120, E-130, E-140, E-150, ADDRESS ALL CODES AND PROVIDE COMPLETE INFORMATION FOR ISSUANCE OF PERMITS. BUILDING PERMIT REQUIRES APPROPRIATE DRAWINGS,ADDRESS AS AN ADDITION TO THIS BUILDING, FIRE-RATINGS AT EXTERIOR WALL ADJACENT TO PROPERTY LINE AND FOR EXITING PROTECTION, WEATHER-RESISTANCE, STRUCTURAL DRAWINGS AND CALCULATIONS INCLUDING FOUNDATIONS. ............................................................... .. 2. SHOW PROPERTY LINE ON ARCHITECTURAL FLOOR PLAN A-110, DIMENSION STRUCTURE FROM PROPERTY LINE ADJACENT TO LINE 'A'. .......................................... ... 3. SHOW FIRE-RATING OF WALL AT LINE 'A'. ............... .. 4. DETAIL HOW FIRE-RATING OF WALL AT LINE 'A' IS MAINTAINED. .................................................................. ..........1. AT PLUMBING PENETRATIONS. ........................ .......... 2. AT CONNECTION OF NEW JOISTS TO EXTERIOR FIRE-RATED WALL. ......................................................... .. 5. DEFINE OCCUPANCY OF ADJACENT TENANT/S PER IBC CHAPTER 3, NOTE ON DRAWINGS. ........................... ... 6. SHOW FIRE-RATING OF DEMISING WALL, ON DRAWINGS, PER IBC SEC 3, SHOW HOW ACCOMPLISHED. ... 7. CLARIFY 2ND EXIT, SHOW COMPLIANCE WITH IBC SEC 7, 10, AND 11, ON DRAWINGS. ................................. ... 8. PROVIDE TYPICAL CROSS-SECTION THROUGH WALLS, SHOWING MATERIALS OF CONSTRUCTION AND CONNECTIONS TO STRUCTURE ABOVE AND BELOW W/ FASTENER TYPE, SIZE, SPACING/NUMBER. .................... ... 9. PROVIDE ACCESSIBILITY PER IBC CHAPTERS 11, 34 AND ANSI A117.1-1998 ed . ............................................. .. 10. PROVIDE CLEAR DIMENSION FOR ACCESSIBILITY AT QUE, REF ANSI A117.1-1998 ed, FIG 403.5.1. .................... .. 11. EXPLAIN HOW DRINKING FOUNTAIN REQUIREMENT OF IBC TABLE 2902.1 IS ACCOMMODATED. ...................... .. 12. DIMENSIONALLY LOCATE MECHANICAL EQUIPMENT AND PENETRATIONS ON ROOF PLAN A-140. .................... .. 13. PROVIDE DETAILS FOR ROOF-MOUNTED EQUIPMENT INSTALLATION. ........................................... .. 14. PROVIDE ROOF CLASSIFICATION ON DRAWING A140, PER IBC CHAPTER 15. ........................................... .. 15. PROVIDE DETAILS FOR REPLACING, PATCHING, REPAIR AND INSTALLATION OF ROOFING. ...................... .. 16. SEPARATE PERMIT REQUIRED FOR SIGNS, REF DWG A-200. ................................................................... .. 17. PROVIDE STRUCTURAL DETAILS FOR NEW ROOF FRAMING, SHOW MATERIALS OF CONSTRUCTION ( NEW AND EXISTING ), HANGERS, CONNECTORS AND FASTENER TYPE , SIZE, SPACING/NUMBER. ................... ..18. PROVIDE OFFICIAL ADDRESS SLIP FROM PIMA COUNTY TO VERIFY SUITE NUMBER.
02/21/2003 MARTIN HAEBERLE MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide cut sheet for GWH to show compliance with Sections 707.1 and 804.2, IMC.
2. Clarify how vent termination of GWH complies with Sections 804.2.1 and 804.3.5, IMC and indicate on plans.
3. Correct arithmetic on air balance schedule.
4. Provide outside air calculations to show compliance with Section 403.2, IMC.
02/21/2003 MARTIN HAEBERLE PLUMBING-COMMERCIAL REVIEW Denied 1. Add gas-fired water heater, GWH, to Gas Piping Diagram (2/M500) and recalculate pipe sizes.
2. The connection of the 3-way solenoid valve for MAU-1 (Keynote 11, 1/M500) directly to the drains for the make-up air unit is an unlawful cross connection; remove it. Reference Section 602.1, UPC.
3. Floor drain in wet room cannot be connected to the grease trap. Reference Section 1011.3, UPC.
4. Provide fixture unit data and connection sizes (water and waste) for all plumbing equipment.
5. Coordinate plumbing fixtures shown on plumbing fixture schedule with fixtures shown on plans. Clarify which water closet on the schedule, WC-1 or WC-2, is being used on the plans.
02/21/2003 ROBERT SHERRY WATER REVIEW Approved
02/21/2003 MARTIN HAEBERLE WATER REVIEW Approved
02/24/2003 GERRY KOZIOL WWM REVIEW Approved
03/07/2003 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied 1. Show existing service on plans, and available fault current at this service, available fault current, with calculations of fault current at new panel locations. Demonstrate that the fault current available at new panel locations is less than their AIC rating.
2. EF-2 is listed on Sheet M 700 as 1 HP, but listed on Sheet E 140 as 1 ½ HP. Please coordinate and clarify.
3. Provide overload protection for EF-2. If the unit is thermally protected, or if the 15A CB was sized per manufacturer's recommendations, state so on the plans.
4. Provide overload and short circuit protection for RTU-2. It appears that both the fuse and CB are oversized. If the unit is thermally protected, or if the 45AF or 45A CB was sized per manufacturer's recommendations, state so on the plans.
5. Circuit for Equipment 21A, #10, has ampacity of 35A using the 75º column of Table 310-16, and cannot be protected by a 40 A CB. See also NEC 240-3 (d).
6. Provide overload protection for Walk-in Cooler/Condenser. If the unit is thermally protected, or if the 40A CB or 25 AF was sized per manufacturer's recommendations, state so on the plans. 25 AF appears oversized to provide overload protection.
7. Per NEC 400-8 (3) flexible cords and cables shall not be used where concealed behind dropped ceilings. Suggest hard-wire and switch arrangement for the Security System on Detail Note 15 Sheet E 120.
8. Provide lighting fixture cut sheets. That is a submittal requirement. We will be looking very closely for adherence to the Lighting Ordinance.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/07/2003 ELAINE ROSE OUT TO CUSTOMER Completed