Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T03CM00209
Parcel: 13216921A

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T03CM00209
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/17/2003 DOUG WILLIAMS FLOODPLAIN REVIEW Approved
01/31/2003 GERRY KOZIOL WWM REVIEW Approved
02/04/2003 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Recirculation of ventilation air from toilet rooms (Office Area and Shop RR) is prohibited. Reference Table 403.3 IMC
2. Coordinate balancing notes on Detail 1/M-2 with Fresh Air Calculations.
3. Coordinate number of RH-1 relief hoods with drawing notes (two shown, "TYP of 3" noted).
4. Provide duct smoke detector for FUR-2. Reference Section 606.2.1
5. Coordinate balancing information for EF-2 shown on Detail 6/M-2 with Equipment Schedule data.
6. Provide combustion air opening for Furnace Room within 12" of Ceiling. Reference Section 703.1.1.
7. Provide material safety data sheets, storage quantities, and expected concentrations of compounds to be utilized in the Glue Booth.
8. Provide additional details of the Glue Booth and clarify the relationship between the Glue Booth and the unit heater, UH.
9. Provide design calculations, duct construction details, and support details for the dust collection system. Reference Sections 510 and 511, IMC.
10. Relocate the dust collector to conform to Sections 511.1.1 and 511.2, IMC.
11. Clarify purpose and geometry of "future duct down to future Selco EB90"
02/04/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide water pressure and water pipe sizing calculations. Reference Appendix A, UPC.
2. Recalculate Fixture Units using values from Table 6-3 and 7-3, UPC.
3. Provide upper terminal cleanout near floor sink. Reference Section 707.4, UPC.
4. Indicate location of cleanouts on Detail 3/P-1.
5. Correct scale on Details 2/P-1, and 3/P-1.
6. Coordinate waste line sizing on Plans with sizing on Detail 2/P-2.
7. Provide location and sizing information for gutters and downspouts. Reference Appendix D, UPC.
8. Provide location and size of RPBP assembly.
02/04/2003 ROBERT SHERRY WATER REVIEW Approved
02/05/2003 JIM EGAN FIRE REVIEW Approved
02/14/2003 BOB SUBA ELECTRICAL-COMMERCIAL REVIEW Approved
02/18/2003 PATRICIA GEHLEN ZONING REVIEW Denied Zoning
2/19/2003
Copies of the approved site and landscape plans must be included in the submittal package prior to review and approval
02/21/2003 MARTIN HAEBERLE BUILDING-COMMERCIAL REVIEW Denied 1. Provide required safety glazing on door and window schedule
2. Provide elevations for accessible restrooms.
3. A structural analysis or an approved manufacturers tables and associated loads is required to be submitted for walls over 20 feet and ceiling joist.
4. A van accessible parking space with an 8-foot loading area is required. Revise plans. Reference section 502.3 ANSI A117.1

Final Status

Task End Date Reviewer's Name Type of Review Description
02/26/2003 DELMA ROBEY OUT TO CUSTOMER Completed