Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T03BU03223
Parcel: 13342001C

Review Status: Completed

Review Details: RESUBMITTAL - GRADING

Permit Number - T03BU03223
Review Name: RESUBMITTAL - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/28/2004 Paul Machado ENGINEERING REVIEW Denied To: Dave Martin, P.E. DATE: April 29, 2004
AMEC Infrastructure, Inc.
3295 W. Ina Road
Tucson, Arizona 85741
SUBJECT: Finisterra Community (D03-0017)
Grading Plan T03BU03223 (Second Review)
T14S, R15E, Section 06

RESUBMITTAL REQUIRED: Grading Plan and Drainage Report

The Grading Plan (GP) and Drainage Report (DR) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Grading Plan:
1. Please include a response letter to the comments along with the corrected copies with re-submittal.
2. The discharge onto Camino Serna exceeds the maximum allowable street flow of 50 cfs per D.S. 3-01.4.4.A. Please include a cross section of the street with the WSEL included in the DR. The Average Velocity and Average Velocity Head have too much energy to approve the increase in the cfs. Perhaps an increase in the retention or a reduction in the discharge may solve this issue. The addendum to the DR shows new a wall openings along Camino Serna (two locations). The discharge still amounts to over 50 cfs. This is not an acceptable alternative. Please resolve. Per previous comment.
3. Provide details and show dimensions for all basins. The GP did not include any details on this submittal as the response letter indicated. The dimensions provided are acceptable, however they not to the degree I was expecting. The basins must be dimensioned properly in order to construct and inspect properly. Please dimension and show cross sections of all retention basins with transverse and longitudinal slopes. Per previous comment.

Drainage Report:
1. Provide details and show dimensions for all basins. The DR did not include any details or dimensions on this submittal as the response letter indicated. The dimensions provided are acceptable, however they not to the degree I was hoping for. Per previous comment.
2. The discharge onto Camino Serna exceeds the maximum allowable street flow of 50 cfs per D.S. 3-01.4.4.A. Please include a cross section of the street with the WSEL included in the DR. The Average Velocity and Average Velocity Head have too much energy to approve the increase in the cfs. Perhaps an increase in the retention or a reduction in the discharge may solve this issue. The addendum to the DR shows new a wall openings along Camino Serna (two locations). The discharge still amounts to over 50 cfs. This is not an acceptable alternative. Please resolve. Per previous comment.
3. Percolation testing is required to be included in the drainage report per Storm water DET./RET. manual in II 2.2. Per previous comment.

Stormwater pollution prevention plan:
1. The SWPPP is accepted.

If you have any questions, I can be reached at 791-5550 x1193 or pmachad2@ci.tucson.az.us
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 791-5550 x1193 office
(520) 879-8010 fax
05/03/2004 TACHONG1 NPPO REVIEW Needs Review
05/03/2004 ASHOFFS1 ZONING REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
05/03/2004 TAMI ACHONG OUT TO CUSTOMER Completed
05/03/2004 TAMI ACHONG REJECT SHELF Completed