Permit Number: T03BU03198
Parcel: 12218166A

Review Status: Completed

Review Details: GRADING

Permit Number - T03BU03198
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/13/2004 James Tate ENGINEERING REVIEW Denied DATE: February 23, 2004
ACTIVITY NUMBER: T04BU03198
PROJECT NAME: Assistance League
PROJECT ADDRESS: 1307 N. Alvernon
PROJECT REVIEWER: James C. Tate, P.E., CFM

The following items must be revised or added to the Grading Plan. Please include a letter with the next submittal addressing how all the engineering and floodplain comments have been addressed.

Resubmittal Required: Grading Plan

Grading Plan

1. A Grading Plan must match the approved Development Plan. Although finished grades may be slightly different, all other information must match. The exsiting contours on the Grading Plan do not match those on the Development Plan.

2. All elevation information on the Development Plan must be on the Grading Plan. All drainage information, basin information, drainage patterns, etc. must be on the Grading Plan. The Grading Plan will be used to inspect the project.

3. Show a length and width dimension for the basin.

4. Show grading limits on the plan. See IBC Chapter 36 Section 14 for required setbacks.

5. Sheet GR2 lists keynotes that are not on the plan.

6. Place a note on the plan, "All roof downspouts will be routed under any adjacent sidewalk. Sidewalks must be flood free for up to the ten year event".

7. Section 5 Sheet GR-3 shows the WSEL as 75.03 and the inlet invert at 75.35 but shows the water surface line higher than the invert. The invert also does not agree with the Development Plan.

8. Show, label , and dimension all proposed sidewalks, curbs, etc.

9. Show all curb radius of all curbs (curb returns, planters, etc).

10. Show, label, and dimension all curb openings, wall openings, walls, etc.

DATE: February 23, 2004
ACTIVITY NUMBER: T03BU03198
PROJECT NAME: Assistance League of Tucson
PROJECT ADDRESS: 1307 North Alvernon Way
PROJECT REVIEWER: Patricia Gilbert, Engineering Associate

The following items must be revised or added to the Storm Water Pollution Prevention Plan (SWPPP). Please include a response letter with the next submittal that states how all comments have been addressed.

RESUBMITTAL REQUIRED: STORM WATER POLLUTION PREVENTION PLAN.

1. Prepare a SWPPP that meets the minimum requirements of the AzPDES General Permit. Use the checklist available on the ADEQ web site to ensure that all required elements are included. Include a copy of the completed checklist with the resubmittal. The checklist is available at www.adeq.state.az.us/environ/water/permits/stormwater.html#const.
02/25/2004 Andrew Connor NPPO REVIEW Denied Submit Native Plant Preservation Plan or Application for Exception
02/26/2004 PETER MCLAUGHLIN ZONING REVIEW Denied Engineering approval required prior to zoning approval.