Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T03BU03106
Parcel: 12801011A

Address:
302 S WILMOT RD

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T03BU03106
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/22/2004 Doug Williams ENGINEERING REVIEW Denied 24 March 2004

Subject: Alamo Parcel Bridge crossing and channel improvements - Engineering Division Review Comments.

Reviewer: Doug Williams

Previous "General Comment" numbers 1 and 3 have not been sufficiently addressed.

1. A LOMR will be required due to the proposed modifications to the FEMA delineated 100-year floodplain limits.

2. Include 2 copies of a hydrology report with this resubmittal, specifically addressing the proposed bridge crossing and channel widening proposed under the current grading and floodplain use permit applications. The report's title should indicate this, and must contain all appropriate hydraulic claculations addressing existing and developed conditions 100-year water surface elevations, including freeboard, scour calculations, freeboard, etc. as they affect the proposed drainage crossing.

If you have any questions, I can be reached at 791-5550 ext. 1189 or DWillia1@ci.tucson.az.us
03/26/2004 David Rivera ZONING REVIEW Denied March 26, 2004
Zoning Review Section
David Rivera
Senior Planner

Zoning will review and approve the grading plan once all zoning comments have been addressed and upon final review and approval of the grading plan by the Engineering Review Section.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/29/2004 DELMA ROBEY OUT TO CUSTOMER Completed