Permit Number: T03BU02750
Parcel: 13629003A

Review Status: Completed

Review Details: GRADING

Permit Number - T03BU02750
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/14/2003 Loren Makus ENGINEERING REVIEW Denied DATE: November 18, 2003
TO: Phil Swaim
SUBJECT: Clements Center Phase II, Site Plan and Grading Permit Permit
REVIEWER: Loren Makus
ACTIVITY NUMBER: T03CM05033 and T03BU02750

SUMMARY: The Site Plan, Grading Permit application and Drainage Report were reviewed by Development Services Department Engineering Division. The Site Plan and Grading Permit can not be approved at this time. Please address the following comments.

Drainage Report Comments:
1. Revise the drainage report to show freeboard calculations for the 100-year flows in the adjacent wash. The top of the cutoff wall must be at least as high as the required freeboard above the water surface elevation. (DS 10-02.8.5.1.4)
2. Provide results of percolation tests to show that the retention basins will percolate within 12 hours. (DS 10-01.3.5.1.3)
Site Plan Comments
3. Make a note that the cutoff wall must be designed and permitted as a retaining wall.
Grading Plan Comments
4. The Grading Plan cannot be approved until the site plan and floodplain use permit are approved.

Revise the Drainage Report to address these comments and resubmit two copies for review along with a $150 review fee. Include a letter explaining how each comment has been addressed.


Loren Makus
Senior Engineering Associate
Engineering Division
Development Services
11/19/2003 Joseph Linville NPPO REVIEW Denied An approved WASH Mitigation and Site plan submittal will be required.

Sheet C204 includes a detail for work proposed north and east of the gymnasium site. This area is not included on the site/landscape/WASH/NPPO plans. The grading plans should be revised based on an established resource area delineation.
11/20/2003 DAN CASTRO ZONING REVIEW Denied Site plan approval and grading plan approval by Engineering Section is required prior to Zoning Review Section approval.

Final Status

Task End Date Reviewer's Name Type of Review Description
11/24/2003 DELMA ROBEY OUT TO CUSTOMER Completed