Permit Review Detail
Review Status: Completed
Review Details: REVISION - GRADING
Permit Number - T03BU02601
Review Name: REVISION - GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/18/2005 | DOUG WILLIAMS | ENGINEERING | REVIEW | Denied | SUBJECT: Grading review - 2951 W. Salvia Dr. REVIEWER: Doug Williams DATE: 18 July 2005 ACTIVITY NUMBER: T03BU02601-R SUMMARY: Engineering Division has reviewed the subject grading plan, and approval is not recommended at this time. Please address all comments provided below: 1. Please remove or block out the Architects seal/signature or obtain and provide written permission for the revisions/alterations proposed on the grading plan. 2. Provide cross-sections for the three perimeters of the proposed fill area, fully labeled and dimensioned with elevations, slopes (H:V), existing and/or proposed slope treatments (such as hand-placed riprap), and property lines - preferably to an engineering scale such as (1"= 10' or 20'). 3. Please Revise General Grading Note # 2 to reference conformance to "Development Standard 11-01.0 (Excavation and Grading)". 4. Refer to Development Standard 11-01.9.3 (Setbacks), and assure all minimum setback requirements are met - clearly dimensioned in the applicable cross-sections. 5. Revise the slope symbols or arrows to indicate drainage in the directions intended. 6. Omit notation for access from the adjacent Park/City property. 7. Remove/revise silt fencing and grading limit callout notes. 8. Provide estimated earthwork (fill) quantity in cubic yards (for grading permit fee purposes). 9. Provide minimum compaction note(s) or requirement(s) for all fill areas. 10. Slope recommendations in the Geotechnical Engineering Report for Montage Vista Phase 2, signed/sealed by Lyle M. Tweet, P.E. (14 Jan. 2004), state that slopes steeper to 2.5:1 (H:V) require additional analysis. Please provide professional geotechnical analysis/recommendations for slopes exceeding these criteria, or revise the plans accordingly. If you have any questions, I can be reached at 791-5550, extension 1189 or via email at Doug.williams@tucsonaz.gov Doug Williams Sr. Engineering Associate Engineering Division Development Services Department |
| 07/21/2005 | DAVID RIVERA | ZONING | REVIEW | Denied | 07/21/05 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/22/2005 | ANGIE SHOFFSTALL | OUT TO CUSTOMER | Completed |
| 07/22/2005 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |