Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T03BU02138
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/22/2003 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | DATE: September 22, 2003 TO: Mr. Walt Rogers, The Acacia Group SUBJECT: Udall Park Improvements Site and Grading Plan Review REVIEWER: Loren Makus ACTIVITY NUMBER: T03CM04068 and T03BU02138 SUMMARY: The Site Plan and Grading Plan were reviewed by Development Services Department, Engineering Division. The Site Plan and Grading Plan were not approved at this time. Please address the following comments. Site Plan and Grading Plan Comments: 1) Provide a site plan with lot dimensions and bearings (including basis of bearing), sight visibility triangles and points of egress and ingress. (Per Development Standard 2-02.2.1.A) 2) Revise the sheet index on page 13 to be consistent with the page numbers of the plan set. Revise the site plan so that all of the type is 12 point or larger. 3) Clarify the extent of the disturbed area. Give the area in acres or square feet. SWPPP Comments: 4) Show how the undisturbed protected areas will be marked to prevent inadvertent disturbance. 5) Clarify the extent of the disturbed area. Give the area in acres or square feet. Ensure that this number matches the information on the Site Plan Revise the site plan to address all of these comments and resubmit two copies for review. Include a letter explaining how each comment has been addressed. Loren Makus Senior Engineering Associate Engineering Division Development Services |
| 10/02/2003 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Site plan approval required prior to grading plan approval. |
| 10/18/2003 | JOE LINVILLE | NPPO | REVIEW | Denied | 1) Grading, hydrology, and landscape structural plans are to be integrated to make maximum use of site storm water runoff for supplemental on-site irrigation purposes. LUC 3.7.4.3.B Revise the landscape plan and grading plans to include or identify water harvesting areas. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/20/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 10/20/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |