Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T03BU02138
Parcel: Unknown

Review Status: Completed

Review Details: GRADING

Permit Number - T03BU02138
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/22/2003 LOREN MAKUS ENGINEERING REVIEW Denied DATE: September 22, 2003
TO: Mr. Walt Rogers, The Acacia Group
SUBJECT: Udall Park Improvements Site and Grading Plan Review
REVIEWER: Loren Makus
ACTIVITY NUMBER: T03CM04068 and T03BU02138

SUMMARY: The Site Plan and Grading Plan were reviewed by Development Services Department, Engineering Division. The Site Plan and Grading Plan were not approved at this time. Please address the following comments.

Site Plan and Grading Plan Comments:
1) Provide a site plan with lot dimensions and bearings (including basis of bearing), sight visibility triangles and points of egress and ingress. (Per Development Standard 2-02.2.1.A)
2) Revise the sheet index on page 13 to be consistent with the page numbers of the plan set. Revise the site plan so that all of the type is 12 point or larger.
3) Clarify the extent of the disturbed area. Give the area in acres or square feet.
SWPPP Comments:
4) Show how the undisturbed protected areas will be marked to prevent inadvertent disturbance.
5) Clarify the extent of the disturbed area. Give the area in acres or square feet. Ensure that this number matches the information on the Site Plan

Revise the site plan to address all of these comments and resubmit two copies for review. Include a letter explaining how each comment has been addressed.

Loren Makus
Senior Engineering Associate
Engineering Division
Development Services
10/02/2003 PETER MCLAUGHLIN ZONING REVIEW Denied Site plan approval required prior to grading plan approval.
10/18/2003 JOE LINVILLE NPPO REVIEW Denied 1) Grading, hydrology, and landscape structural plans are to be integrated to make maximum use of site storm water runoff for supplemental on-site irrigation purposes. LUC 3.7.4.3.B
Revise the landscape plan and grading plans to include or identify water harvesting areas.

Final Status

Task End Date Reviewer's Name Type of Review Description
10/20/2003 TAMI ACHONG OUT TO CUSTOMER Completed
10/20/2003 ANGIE SHOFFSTALL REJECT SHELF Completed