Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T03BU01928
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/05/2003 | PATRICIA GILBERT | NPPO | REVIEW | Denied | An approved development plan is required prior to grading plan approval. A pre-permit inspection is required prior to grading plan approval. To schedule call 791-5550, 1118. |
| 08/05/2003 | DAVID RIVERA | ZONING | REVIEW | Denied | Zoning will approve the grading plan upon approval by the Engineering and Landscape sections. |
| 08/07/2003 | JIM TATE | ENGINEERING | REVIEW | Denied | DATE: August 7, 2003 ACTIVITY NUMBER: T03BU01928 PROJECT NAME: Riverfront Village Apartments PROJECT ADDRESS: 811 E. Wetmore Rd. PROJECT REVIEWER: James C. Tate, P.E. The following items must be revised or added to the Grading Plan. Please include a letter with the next submittal addressing how all the engineering and floodplain comments have been addressed. Resubmittal Required: Grading Plan Grading Plan 1. A copy of the stamped approved Development Plan must be included with the Grading Plan submittal. 2. All permits required to construct the drainage structures on Pima County property must be obtained prior to Grading Plan approval. Provide copies of the relevant permits. Development Plan General Note 30. 3. Place a note on the Grading Plan that all roof downspouts will be routed under any adjacent sidewalk. Sidewalks must be flood free for up to the ten year event. 4. All the building perimeters are surrounded by sidewalks. No scuppers have been provided. Sidewalks must be flood free for up to the ten year event. Provide. 5. The scupper at the northeast corner of Building 2 is in the wrong location. The scupper must exit into the PAAL. 6. The Grading Plan shows a 5 ft. curb opening at the southeast corner of the property. This curb opening is not shown on the Development Plan. What is the purpose of this opening. The Drainage Report states that all flows will exit the property at one location (at the north end of the property). 7. The slope at the far east PAAL is incorrect. The grades show the PAAL draining to the south. The grade arrow indicates a 0.5% grade to the north. The Drainage Report and Development Plan show this PAAL draining to the north. Correct the Grading Plan. 8. Indicate by appropriate finish grades how drainage will be routed around the southwest corner of Building 2 and not allowed to drain onto Wetmore. NPDES DATE: August 5th, 2003 ACTIVITY NUMBER: T03BU01928 PROJECT NAME: Two Seasons PROJECT ADDRESS: 811 East Wetmore PROJECT REVIEWER: Patricia Gilbert, Engineering Associate The following items must be revised or added to the Storm Water Pollution Prevention Plan (SWPPP). Please include a response letter with the next submittal that states how all comments have been addressed. RESUBMITTAL REQUIRED: STORM WATER POLLUTION PREVENTION PLAN. 1. Please include site map in the title block on the SWPPP. 2. Identify the receiving waters within one mile of the project on the location map. Part IV.C.2.e. 3. Each operator is responsible for submitting a completed NOI to ADEQ and to the City of Tucson. Because Entranco will function as the operator with "Operational Control over Construction Plans and Specifications", Entranco is required to submit an NOI. 4. Identify off-site material storage areas used solely by the project. If there is not an off-site material storage area, please state so in the narrative. Part IV.C.6 5. Describe vehicle and equipment maintenance controls in the narrative. Part IV.c.5 6. Clearly state on the site map and the inspection form that if a BMP has been used inappropriately, it must be must be replaced or modified within 24 hours. Part IV.D.2.b. 7. In areas where construction has temporarily or permanently ceased, stabilization measures must be implemented within 14 days. If construction will resume within 14 days, then no stabilization measures are needed. Please state this in a general note in an appropriate location in the narrative. Part IV.D.4.b, Part IV.D.4.b.i 8. In section 4.3 Stabilization Sequence there is reference to Section 5.2, it is not clear why there is reference to Section 5.2. Please clarify. 9. If stabilization includes establishing perennial vegetation, and drought conditions or seasonally arid conditions preclude vegetation establishment, vegetative stabilization must be initiated as soon as practicable. Please include this in a general note in Section 4.0. Part IV.D.4.b.iii 10. Include the following records of stabilization in the narrative: Dates when major grading activities occur. Part IV.D.4.c.i Dates when construction temporarily or permanently ceases on a portion of the site. Part IV.D.4.c.ii Dates when stabilization measures are initiated and completed. Part IV.D.4.c.iii 11. On the site map include the location of the Rillito River. Label on the site map. Part IV.C.3. 12. Please indicate in the narrative compliance with Clean Water Act (CWA) Section 404. 13. Describe Post Construction Stormwater Controls that will be installed during construction. (i.e. Pipe Outlet) Confirm that the design and installation of the post construction controls are consistent with applicable local or state requirements. 14. On the inspection form include: 1. Verify SWPPP measures are implemented and effective. 2. Note any BMP deficiencies and include corrective action schedule 3. Note any maintenance needs or modifications 4. Certify that facility is in compliance with the SWPPP. 15. Demonstrate that the sediment controls of the new earthen channel east of the project meets the requirements of Part IV.D.5 16. Specify in the inspection schedule that after a 0.5" rainfall event an inspection is required within 24 hours. Part IV.H.1 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/07/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 08/07/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |