Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T03BU01729
Parcel: 117042400

Address:
529 N 6TH AV

Review Status: Completed

Review Details: GRADING

Permit Number - T03BU01729
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/07/2003 PATRICIA GILBERT ENGINEERING REVIEW Denied DATE: July 3, 2003
ACTIVITY NUMBER: T03BU01729
PROJECT NAME: Office Building Renovation for Gene Rossitti
PROJECT ADDRESS: 529 North 6th Avenue
PROJECT REVIEWER: Patricia Gilbert

The following items must be revised or added to the Grading Plan. Please include a response letter with the next submittal that states how all comments have been addressed.

RESUBMITTAL REQUIRED: GRADING PLAN

1. Add a note on the plan, "All roof down spouts will be routed under any adjacent sidewalk." Sidewalks must be flood free for up to the 10-yr. event. The plan shows sidewalks adjacent to the building on the north, east, and west sides. If the intention is to have the one foot wide planter on the east side of the building contain the entire roof drainage from this side of the building provide appropriate drainage calculations. Otherwise, provide appropriate sidewalk scuppers. DS 2-08.4.1.E.

2. Show roof drainage (flow arrows). DS 2-02.2.1.A.16

3. The proposed sign at the south parking lot exit encroaches into the FEMA floodplain. Any proposed development in the floodplain requires a Flood Use Permit. Either locate all development outside the floodplain or submit a Flood Use Permit application with the next submittal. Flood Use Permit approval is required prior to Grading Plan approval. Tucson Code Chapter 26

4. The Site Plan and Grading Plan have the same sheet numbers. Perhaps the intention was for the Grading Plan to be labeled G1. Re-label.

5. The Site Plan is currently in the review process. Any changes made to the Site Plan must be reflected on the Grading Plan. The Grading Plan will not be approved until the Site Plan is approved.
07/07/2003 PATRICIA GILBERT NPDES REVIEW Passed Less than one acre of disturbance.
07/24/2003 PETER MCLAUGHLIN ZONING REVIEW Denied The Grading Plan cannot be approved until the Site Plan is approved.
07/30/2003 JOE LINVILLE NPPO REVIEW Denied The grading application will be reviewed for compliance with the site/landscape/NPPO plans when approved. Inspections may be required prior to grading.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/31/2003 TAMI ACHONG OUT TO CUSTOMER Completed
07/30/2003 ANGIE SHOFFSTALL REJECT SHELF Completed