Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T03BU00134
Parcel: 12414050A

Address:
1440 E 15TH ST

Review Status: Completed

Review Details: GRADING

Permit Number - T03BU00134
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/23/2003 DOUG WILLIAMS FLOODPLAIN REVIEW Denied see below:









SUBJECT: Cooke Cablevision Inc.
REVIEWER: Doug Williams
DATE: 19 Feb 03
ACTIVITY NUMBER: T03BU00134


SUMMARY: Engineering Division has reviewed the grading plan received on 17 January 2003. Grading Plan approval is not recommended at this time. A floodplain use permit is required prior to grading permit issuance.


Grading Plan Comments:


1. Provide two copies of the Geotechnical Report.

2. Provide an administrative or site address on the cover sheet of the Grading Plan.

3. Remove the 100-year floodplain limits depicted and corresponding keynote 17 from the plan. This depiction does not appear to coincide with this project, and appears to reflect a revised 100-year floodplain delineation.

4. Submit a completed floodplain use permit application and the $50.00 submittal fee with the grading plan resubmittal.

5. Provide wall opening spacing and sizing for the new wall.


If you have any questions, I can be reached at 791-5100 ext. 1189 or Dwillia1@ci.tucson.az.us.


Douglas Williams
Senior Engineering Associate
Engineering Section
Development Services
02/18/2003 DOUG WILLIAMS ENGINEERING REVIEW Approved
02/19/2003 DOUG WILLIAMS NPDES REVIEW Passed
02/20/2003 PETER MCLAUGHLIN ZONING REVIEW Denied Floodplain and NPPO approval required prior to zoning approval of grading plan.
02/26/2003 JOE LINVILLE NPPO REVIEW Denied An approved site plan including landscape plans is required in order for the review to proceed.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/26/2003 TAMI ACHONG OUT TO CUSTOMER Completed