Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T03BU00001
Review Name: GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/03/2003 | LOREN MAKUS | NPDES | REVIEW | Denied | This project is subject to the AzPDES and NPDES requirements as described in the February 18, 1998 General Permit. The stormwater plan contained within the grading submittal does not nearly address the minimum requirements of the General Permit. Prepare and submit a SWPPP that will meet the requirements of the Construction General Permit. A copy of the checklist was e-mailed to URS in December 2002. All applicable items on the checklist must be addressed in the SWPPP. |
02/24/2003 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | SUBJECT: Aircraft Rescue and Fire Fighting Training Facility Engineering & Floodplain Review DATE: February 24, 2003 ACTIVITY NUMBERS: T03BU00001 (see also T02CM03367) SUMMARY: Engineering has received and reviewed the revised Civil Drawings and Drainage Report for Grading Plan Review. In order to process a grading permit, the Grading Plan review comments must be addressed as stated below. GRADING PLAN COMMENTS 1) City of Tucson Development Standards (DS) Section No.2-03.2.4.L.5: Approval documentation and permits from other jurisdictions for acceptance of proposed construction shall be obtained. 2) DS Sec.2-02.2.1.A.35: Provide method of restricting public access. 3) DS Sec.10-01.3.5.1.5: Update Specifications Report Section 02220 Part 3.5; provide soil testing results and description of soil suitability for this project. Provide two copies of geotechnical report. 4) DS Sec.10-01.3.5.1.3.a: Provide results from percolation tests showing effective infiltration rates. Geotechnical report shall address percolation for both of the proposed basins. 5) DS Sec.10-01.3.4.2: Regarding note 3 on sheet G2.1; provide a notation regarding restricted construction activity in basin #2 (such as no wash out area or no storage area, etc). 6) DS Sec.10-01.5.2.1: From the recently submitted Appendix 2 Drainage Report, no engineer's seal was found on the submitted document. Provide two copies of the drainage report sealed by the registrant who prepared the drainage report. Further comments may be forthcoming upon receipt of geotechnical report. For any questions, call me at 791-5550, extension 2204. Elizabeth Eberbach, PE Civil Engineer Engineering Section Development Services |
02/24/2003 | ELIZABETH EBERBACH | FLOODPLAIN | REVIEW | Denied | SUBJECT: Aircraft Rescue and Fire Fighting Training Facility Engineering & Floodplain Review DATE: February 24, 2003 ACTIVITY NUMBERS: T03BU00001 (see also T02CM03367) SUMMARY: Engineering has received and reviewed the revised Civil Drawings and Drainage Report for Grading Plan Review. In order to process a grading permit, the Grading Plan review comments must be addressed as stated below. GRADING PLAN COMMENTS 1) City of Tucson Development Standards (DS) Section No.2-03.2.4.L.5: Approval documentation and permits from other jurisdictions for acceptance of proposed construction shall be obtained. 2) DS Sec.2-02.2.1.A.35: Provide method of restricting public access. 3) DS Sec.10-01.3.5.1.5: Update Specifications Report Section 02220 Part 3.5; provide soil testing results and description of soil suitability for this project. Provide two copies of geotechnical report. 4) DS Sec.10-01.3.5.1.3.a: Provide results from percolation tests showing effective infiltration rates. Geotechnical report shall address percolation for both of the proposed basins. 5) DS Sec.10-01.3.4.2: Regarding note 3 on sheet G2.1; provide a notation regarding restricted construction activity in basin #2 (such as no wash out area or no storage area, etc). 6) DS Sec.10-01.5.2.1: From the recently submitted Appendix 2 Drainage Report, no engineer's seal was found on the submitted document. Provide two copies of the drainage report sealed by the registrant who prepared the drainage report. Further comments may be forthcoming upon receipt of geotechnical report. For any questions, call me at 791-5550, extension 2204. Elizabeth Eberbach, PE Civil Engineer Engineering Section Development Services |
02/25/2003 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | Zoning 2/26/2003 Zoning will review and approve the plans once Engineering/Floodplain has approved. |
02/28/2003 | PATRICIA GILBERT | NPPO | REVIEW | Passed | Administrative Waiver |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/11/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |