Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T02OT00914
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/23/2002 | JIM EGAN | FIRE | REVIEW | Approved | |
| 08/27/2002 | PETER MCLAUGHLIN | HANDICAP-SITE | REVIEW | Approved | |
| 08/27/2002 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | TO: Paul Edwards 1418 N. Sahuara Ave Tucson, AZ 85712 FROM: Peter McLaughlin Senior Planner FOR: Patricia Gehlen Principal Planner PROJECT: Hanarm, LLC 2623 N. Campbell Ave Site Plan 2nd review TRANSMITTAL: September 10, 2002 1. As noted in the response comments, a Board of Adjustment Variance is required to allow the reduced (22-1/2 foot proposed) PAAL width. When the variance is granted, add a general note to the site plan which includes case number, what the variance was approved for, the date of approval and conditions imposed. DS 3-05.2.1.C DS 2-02.2.1.38 2. Revise required building setbacks to specify that the street yard setback is the greater of 21' or the height of structure measured from back of future curb location. Also, add a statement specifying that the street front setback provided is measured from back of future curb location. The west perimeter line building setback and the street front (east) building setback requirements are not met. Because this is a change of use, a Lot Development Option (LDO) will be required for the east and west lot lines. As previously noted, rather than applying separately for the LDO, the setback requests may be included as part of the variance package. LUC 3.2.6.5 DS 2-02.2.1.31 If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608. |
| 08/28/2002 | BLANCA ESPINO | SANITATION | REVIEW | Approved | SEE ENGINEERING FOLDER |
| 08/28/2002 | BLANCA ESPINO | ENGINEERING | REVIEW | Approved | |
| 08/28/2002 | BLANCA ESPINO | FLOODPLAIN | REVIEW | Approved | SEE ENGINEERING FOLDER |
| 09/10/2002 | PATRICIA GEHLEN | LANDSCAPE | REVIEW | Denied | Site plan approval required. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/12/2002 | TAMI ACHONG | OUT TO CUSTOMER | Completed |