Permit Number: T02OT00914
Parcel: 113070470

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T02OT00914
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/23/2002 JIM EGAN FIRE REVIEW Approved
08/27/2002 PETER MCLAUGHLIN HANDICAP-SITE REVIEW Approved
08/27/2002 PETER MCLAUGHLIN ZONING REVIEW Denied TO: Paul Edwards
1418 N. Sahuara Ave
Tucson, AZ 85712

FROM: Peter McLaughlin
Senior Planner

FOR: Patricia Gehlen
Principal Planner

PROJECT:
Hanarm, LLC
2623 N. Campbell Ave
Site Plan
2nd review

TRANSMITTAL: September 10, 2002


1. As noted in the response comments, a Board of Adjustment Variance is required to allow the reduced (22-1/2 foot proposed) PAAL width. When the variance is granted, add a general note to the site plan which includes case number, what the variance was approved for, the date of approval and conditions imposed.
DS 3-05.2.1.C
DS 2-02.2.1.38

2. Revise required building setbacks to specify that the street yard setback is the greater of 21' or the height of structure measured from back of future curb location. Also, add a statement specifying that the street front setback provided is measured from back of future curb location. The west perimeter line building setback and the street front (east) building setback requirements are not met. Because this is a change of use, a Lot Development Option (LDO) will be required for the east and west lot lines. As previously noted, rather than applying separately for the LDO, the setback requests may be included as part of the variance package.
LUC 3.2.6.5
DS 2-02.2.1.31


If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608.
08/28/2002 BLANCA ESPINO SANITATION REVIEW Approved SEE ENGINEERING FOLDER
08/28/2002 BLANCA ESPINO ENGINEERING REVIEW Approved
08/28/2002 BLANCA ESPINO FLOODPLAIN REVIEW Approved SEE ENGINEERING FOLDER
09/10/2002 PATRICIA GEHLEN LANDSCAPE REVIEW Denied Site plan approval required.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/12/2002 TAMI ACHONG OUT TO CUSTOMER Completed