Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T02OT00727
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/02/2002 | JIM EGAN | FIRE | REVIEW | Approved | |
| 07/11/2002 | DAN CASTRO | ZONING | REVIEW | Denied | COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. CODE SECTION/ DEVELOPMENT STANDARD 1. Covenant was not found in the resubmittal packet. Previous comment: Lot combination is required for this site. Attached is a copy of the covenant prepared by the City Attorney's Office, which must be recorded prior to site plan approval. D.S. 2-02.2.1.A.2 2. Bicycle parking calculation noted on sheet CE-1 states that 2 Class II and 2 Class I spaces are provided, while the bicycle parking space detail and the location noted on the plan indicates 4 Class II spaces are provided. D.S. 2-02.2.1.A.9/ D.S. 2-02.2.2.A.4/ L.U.C. 3.3.4/ D.S. 2-09 3. All buildings on-site must be connected to the on-site pedestrian circulation system. It appears that the two- (2) buildings located in the northeast portion of the property do not connect to the pedestrian circulation system. Please demonstrate how these buildings will connect to the pedestrian circulation system as per D.S. 2-08 requirements. D.S. 2-02.2.1.A.12/ D.S. 2-08 4. All requested changes must be made to the site and landscape plans. D.S. 2-07.2.1.A 5. Review of this plan for Zoning Review compliance may be done over the counter. Please contact me to set up an appointment. |
| 07/11/2002 | DCASTRO1 | HANDICAP-SITE | REVIEW | Approved | |
| 07/17/2002 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: George Holguin Architect Engineering Section SUBJECT: 5330 E. Bellevue street Site plan T02OT00727 (Second Review) T14S, R14E, Section 2 RESUBMITTAL REQUIRED: Site Plan. The Site Plan (SP) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Site Plan: 1. Please complete lot dimensions and bearings D.S. 2-02.2.1.5. The overall dimensions are preferred. 2. Please provide adjacent property grades for review in accordance with in 2000 IBC section 13 concerning fills. The FFE are the elevations that are the most important. Show the FFE's to the North of the property. 3. Show existing and if applicable future sight visibility triangles on Bellevue Avenue. The proper distance for a P.A.A.L. to a local street is 185'x110'. Please revise plans. 4. Please provide Drainage patterns and finished grades per D.S. 2-02.2.1.16. The shown patterns and grades are acceptable. Please show compliance with the basin design requirements per Storm Water Detention/Retention Manual chapter 3.6. 5. Please add basin responsibility note to general notes. 6. A separate grading submittal will be required due to the excess of 50 yards cut/fill. 7. Call out the slopes on cross-section A-A. 8. Show existing topography at intervals not exceeding 2' with CI called out and/or spot elevations per D.S. 2-01.2.1.23. Call out the CI below the north arrow. 9. Show location and access of refuse container per D.S. 6-01. Its appears that the turning radius does not meet the minimum criteria for service vehicles (50' Min.). If you have any questions, I can be reached at 791-5550 or pmachad2@ci.tucson.az.us |
| 07/17/2002 | ANY | SANITATION | REVIEW | Denied | |
| 07/17/2002 | ANY | FLOODPLAIN | REVIEW | Denied | |
| 07/25/2002 | JOE LINVILLE | NPPO | REVIEW | Approved | Exception. Existing saguaros and 2 yuccas to be PIP. See landscape plan for additional plants. |
| 07/25/2002 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/06/2002 | TAMI ACHONG | OUT TO CUSTOMER | Completed |