Permit Number: T02OT00325
Parcel: 12904325A

Address:
2001 E 15TH ST

Review Status: Completed

Review Details: FLOODPLAIN

Permit Number - T02OT00325
Review Name: FLOODPLAIN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/19/2002 BLANCA ESPINO FLOODPLAIN REVIEW Approved Blanca Espino 03-19-2002 (Special Inspection Required).

Conditions for Floodplain Use Permit # T02OT00325 (Proposed new detached structure at 2035 E. 15th Street, Property owner Hector P. Raguzin.

The applicant is authorized to use a portion of the flood hazard area in the City of Tucson on the property described as AMERICAN VILLA RESUB N90' S100' LOT 10 & S100' LOTS 11 THRU 14 & S100' W18' LOT 15, BLK 20.

For the purpose of constructing a commercial building.

The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard, and Watercourse Amenities, Safety and Habitat regulations, and are particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit.

The following conditions shall apply to this permit.

1. All work shall conform to the attached plans which are made part of this permit.

2. Any building shall be placed on a engineered pad, compacted to 95% density, extending twenty-five (25) feet beyond the buildings foundation, unless a study prepared by a state-registered professional civil engineer and approved by the city engineer shows that a lesser distance is acceptable.

3. The lowest finish floor of the building in the property under this permit shall be placed upon a dirt, concrete, or similar type solid pad a minimum of 2444.00 feet above mean sea level, National Geodetic Verticle Datum 1929 (NGVD 1929), as Certified by a Registered Land Surveyor. This certification must be completed and returned to the Development Services Dept., The Office of the City Engineer, Engineering Section on the 1st. floor of the County/City Public Works Building at 201 N. Stone Avenue. This Certification must be completed immediately after the finished floor is constructed. Please call Development Services Department at 791-5550 or 740-6970 (IVR) for inspection prior to any wall construction.

4. The existing drainage patterns at the property lines shall not be obstructed.

5. Within 5 (five) days of issuance of this permit, through completion of the project, notification must be posted and maintained in a conspicuous place on the job site stating "Construction proceeding under requirements of City of Tucson Floodplain Permit #T02OT00325. For information please call 791-5550."

6. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties.

7. This permit becomes invalid and is subject to additional floodplain review, if any required development permit (s') changes the configuration of the structure and or site development.

This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions set forth in this permit are not complied with. Also, this permit will expire one year from its date of issue. Renewal of this permit will require a new application, review and approval of that application by the City of Tucson, Development Services Department, Engineering Section.

(EXPIRATION DATE) Month: 03 Day: 19 Year: 2003

Note the final inspection or certificate of occupancy will be on hold until the Elevation
Certificate is completed and returned to our office.

The applicant is authorized by the City Engineer to receive a floodplain use permit subject to the above referenced conditions and restrictions.
03/19/2002 DROBEY1 ZONING REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
03/19/2002 DELMA ROBEY OUT TO CUSTOMER Completed