Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL TI
Permit Number - T02CM05903
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/21/2003 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet A4 1. Specify door hardware. Ref. IBC 1003.3.1.8. 2. Provide maneuvering clearance at director's door for the pull side front approach condition. Ref. ANSI A117.1, 404.2.4.1. 3. Provide maneuvering clearance at restroom door for the push side front approach condition. Note that the minimum distance beyond the latch parallel to the door is 12" where both a closer and a latch are provided. ANSI A117.1, 404.2.4.1. 4. Specify / detail threshold requirements. Ref. IBC 1003.3.1.6. 5. Please show the attic access. Ref. IBC 1208. 6. Please specify 1 hour fire resistive item from IBC Table 719.1 or the listing number for the assembly from an approved testing agency. Sheet A6 1. Please specify minimum roof covering fire classification. Ref. IBC 1505. Sheet A8 1. Show the surrounding finish material for the restroom floors and walls. Ref. IBC 1209.1, 1209.2. 2. There appears to be a plotting / drafting error on this sheet. Interior elevation keynotes are incomplete at elevations 17 through 21 and a portion of the ribbon was not reproduced. Sheet A9 1. Please provide an attic ventilation calculation and specify the size, type and location of the attic vents to provide the net free ventilating area. Ref. IBC 1202. STRUCTURAL COMMENTS Sheet S3 1. Please clarify exterior masonry wall dimensions at the south side of the new addition. The architectural callout on Sheet A4 is for 4 x 8 x 16 c.m.u. This sheet specifies 8 x 8 x 16 c.m.u. Sheet S4 1. Roof framing keynote for the opening in the wood wall appears to be mislabeled. Please revise. Sheet S5 1. Please specify column base connection i.e., CB46, CB66 at detail 105/S5. 2. Please provide length, width, thickness and reinforcement specifications for footing 104/S5. PLUMBING COMMENTS Sheet P2 1. Please specify cross connection control for the new hose bibs. Ref. UPC 603. MECHANICAL COMMENTS Sheet M1 1. Given the proximity of the 7" EDTR location to the kitchen, please specify the EDTR to comply with IMC 401.5.2. ELECTRICAL COMMENTS Sheet E2 1. Please note the disconnecting means for the roof top mechanical unit. Ref. NEC 440-B. 2. The exterior gfci /wp receptacle at the office exit door appears to have the circuit mislabeled. Please clarify if this should be noted as L1-13. ENERGY COMMENTS Sheet E2 1. Please show the interior lighting power analysis. Ref. IECC 705.4. |
| 05/21/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
| 05/21/2003 | EROSE1 | WATER | REVIEW | Needs Review | |
| 05/21/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
| 05/21/2003 | EROSE1 | ENGINEERING | REVIEW | Needs Review | |
| 05/21/2003 | EROSE1 | FIRE | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/21/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |